Skip to content

Local provider profile

Michael Jackisch

Documented work across Connecticut based on attributed municipal records.

Jobs on record1Recorded in our system
Reported work volume$123KDocumented jobs
Average project$123KWhere values are reported
First observed2026Available dataset
Categories1Observed work types
Used for work inRidgefield1 jobs

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Aerial image of 66 Grove St, Ridgefield, CT

66 Grove St

Ridgefield, CT
2026Demolition

FURNISH ALL LABOR and MATERIALS TO COMPLETE THE HVAC SCOPE OF WORK AS DETAILED BELOW per drawings (M001, M002, MD101, M101, M101A, M102, M201, M301, M302, M401, M402, M403)- HVAC demo, cut and cap to make safe. Drop to floor (removal by others)- Furnish and install 1 exhaust fan referred as TX-1 on drawing M2.01- Furnish and install all ductwork, RGD's, flex duct, dampers, hangers, supports, insulationand labels per drawings. Includes all submittals and shop drawings- Includes TAB balance report on finished system- Includes permit, inspections and fee. Includes daily cleanup of work area, debris to be discarded into supplied dumpster on site.

$123K