55 Railroad Ave
Greenwich, CT- 2026Mechanical
HVAC Work
$118K
Local provider profile
Project Manager · EMCOR Services New England Mechanical (NEMSI)
Documented work across Connecticut based on attributed municipal records.
Enriched provider details
Supplemental data supplied by FullContact and stored separately from public records.
FullContact query stored 2026.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
HVAC Work
$118KAnd water balancingStart-test-and place system into operation.
$85.5KFour ceiling Install 12 exhaust others)Furnish diffusers and three return grillsRelocate space sensorAir Balance fans and 14 elephant trunks (equipment provided by and install exhaust duct, 6 back draft dampers, 2 duct grills, and 13.
$3.5KBuilt drawings.
$1.1MVent caps.
$81.5KWiring labor Proposed second and material floor addition and renovation of existing first floor to include,.
$57.3KHVAC Work
$60KHVAC Work
HVAC, Geothermal, Chimney liners & Oil Tank Permit WILTON
$19.4KHVAC, Geothermal, Chimney liners & Oil Tank Permit WILTON
$29.8KHVAC Work
And associated ductwork and piping.
$215KHVAC, Geothermal, Chimney liners & Oil Tanks
$35.8KHVAC Work
HVAC Work
HVAC
Modifications to the existing VAV system for new office layouts, with new and used VAV, RGD's ductwork and controls, and 2 new supplemental heat pumps.
$90KTie in 500-ton temp chiller (emergency chiller in on site).
$127KProvide and install ductwork, vavs, ef, rgds, euh with associated insulation, and balancing specified.
$222KHeating vav box, controls, rgd's. Air balance.
$25.9KWhere necessary, air balance.
$14.2KInstall two nominal 20-ton gas heat/electric cool rooftop units.
$156KHVAC medical office fit-out: VAVs, split AC, exhaust fan, ductwork, installation, RGD, and fire dampers.
$733K