Tods Driftway
Greenwich, CTEL2
$35KLocal provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
EL2
$35KInstall 2 1 ft. Conduits for a 20-amp circuit fed from an existing ticket machine, 250 ft. Away, with #12 wire, a 20-amp breaker, and 1 ft. Of PVC.
$5KInstall a 200-amp service for a parking kiosk, 1-amp drain; 3" PVC, 3/0 feeder, 2 ground rods, #4 ground, and #12 wire for a 20-amp circuit.
$5KInstall underground conduits for lights to be moved. Work associated with PLPZ 202000306 at the corner of Greenwich Ave. And East Elm St.
$2KInstall underground conduits for lights to be moved. Work associated with PLPZ 202000306 at the corner of Greenwich Ave. And East Elm St.
$2KInstall underground conduits for lights to be moved. Work is on the corner of Greenwich Avenue and East Elm Street.
Install 2 1-inch conduits from the existing electrical panel in the Gun Range. #12 wire, 20-amp breaker, 1 ft. PVC.
$5KInstall a 20 A circuit for a ticket machine in the pad. No service is required; power will come from a lighting panel in the parking lot (no service needed).
$5K200-amp service and circuit for new ticket machine; 3" PVC, 2" PVC for phone, 2 ground rods; service is underground.
$6KInstall 2" rigid conduit across street and replace existing broken conduit.
$3KInstall 200-amp service for cell tower and panel; also install 200-amp transfer switch.
$5KInstall temporary lighting power for Rock Show; setup on Friday; inspection on Friday 11/1/19 at 3 PM at Civic Ctr. Receipt 19-3028 for $100 paid.
Install temporary lighting power for Rock Show; setup on Friday; inspection on Friday 11/1/19 at 3 PM at Civic Ctr. Receipt 19-3028 for $100 paid.
Special event lighting. Receipt 18-3365 for $100 paid. Inspection Nov 2nd at 3 PM.
Special event lighting. Inspection on 12/1/17, between noon and 2 PM. Receipt 17-3676 for $100 paid.
Install new 200-amp service for parking meters. Conduit is 3" PVC and 2" PVC for phone, with 2 ground rods and 1 circuit for parking meters.
$5K0 West End Ave - Parking Lot Behind CVS 200-amp service for parking lot Lighting: 2 light poles each to have1 400 watt LED light. Amendment (7/29/19): 200-amp service; master pedestal next to firehouse; install 6 new light poles in parking lot behind firehouse. Amendment (8/1/19): deleting 200-amp service from job; existing circuit from firehouse will be used instead; delete EVERSOURCE number. Crossreferenced with Building Permit 19-2056.
$8KRepair the service mast for platform lights on the pole. Repair the torn pole service for parking lot lights at Riverside Train Station, northbound. Eversource considered this one job.
$5K200-amp service for parking meters.
$5K200-amp service for parking meters.
$5KInstall 200-amp service for parking meter.
$5K200-amp pedestal-mounted service for parking meters.
$5KInstall 200-amp service for parking meters. The meter is pedestal-mounted. All required ballards (CRS; 3131568).
$5K10 kW generator. Plumbing: gas line to generator. Receipt 18-2637 for $40 paid.
$2KInstall 20 conduit for ticket machines and one 20-amp circuit for a ticket machine, fed from the police department.
$5KInstall 20 conduit for ticket machines and one 20-amp circuit for a ticket machine, fed from the police department.
$5KInstall 200A service for ticket machines, 3" pipe for service groundrods 1 circuit meter pedistal AKA 12 East Elm Street.
$5KInstall a propane gas pump and control power from the Parks and Rec Building to the slab for a new propane tank. Main feed: 240, 3 om, 30 A; control and light feed: 120, 20 A.
Temporary lighting for a special event. Receipt 18-0832 for $100 paid. Inspection 4/6/18 at 2 PM.
Temporary lighting for a special event. Receipt 18-0832 for $100 paid. Inspection 4/6/18 at 2 PM.
Temporary wiring for a special event; inspection April 8 at 8 AM. Receipt 17-0922 for $100 paid.
Install speaker cluster above ice rink all low voltage wiring.
$1KInstall pedestal meter and parking meters on 2 concrete pads in front of CVS store; 3" PVC, 4/o wire, ground rods; 200-amp Underground service.
$8KInstall pedestal meter and parking meters on 2 concrete pads in front of CVS store; 3" PVC, 4/o wire, ground rods; 200-amp Underground service.
$8KMove old 200-amp Existing service: 20 ft. To the left. Install 2 parking meters next to the service and 2 parking meters next to CVS; bollards to be installed as needed.
$4K41 Lewis St. B: 200-amp service for parking machines underground.
$4KInstall a 200-amp meter and panel for 2 parking meters to be installed in front of the post office parking lot, with underground service; a bollard to be used as needed.
$4KUnit A: 200-amp service– Unit B), underground pad mount, and connection of 2 parking meters.
$4KReplace 4 old telephone poles in the railroad parking lot and re. Install parking lights and aerial cable.
$10KSpecial event lighting. Receipt 17-3465 for $100 paid. Inspection 11/3/17 at 3 PM.
Special event lighting. Receipt 17-3465 for $100 paid. Inspection 11/3/17 at 3 PM.
Tent wiring for Westchester Glass Show. Receipt 16-3833 for $100 paid.
Install new pvc conduits to gates and card readers at entrances and exits; old conduits are not good; conduits run underground to garage and change over to EMT and are installed in ceiling; each gate gets its own 20 a. emergency circuit.
$10KInstall 1 light above the ramp and wire up handicap push bottoms for the door; also run 4 4: rigid conduits for future service replacement conduits. Run from the back of service to the manhole in the street, but make no connections and pull no wire.
200-amp service; , underground for new parking meters to be installed.
$4KReplace 100-amp meter can (meter was damaged).
$3KInstall hallway interior renovations: exit lights and low voltage for doors and lights in hallways.
Install 800 ft. Of 2" EMT for security fiber cable and 1,000 ft. Of 1 ft. And 3/4 EMT and Cat6 for cameras in the parking garage. This is only for low-voltage security cabling on the second and third floors of the garage.
$5KUnit B: 200-amp service; new service to parking meters. Location: on the middle parking island bollard. Service will be on Liberty Way, but the Town address is 21 East Elm, Unit B.
$4KUnit B: 200-amp service; new service to parking meters. Location: on the middle parking island bollard. Service will be on Liberty Way, but the Town address is 21 East Elm, Unit B.
$4K200-amp service, underground for new parking meters to be installed.
$4KUnit A. 200-amp service for parking meters. The location is on the Middle Parking Island Bollard. The service will be on Liberty Way, but the town address is 21 East Elm.
$4KInstall pipe, wire, and 5 light poles, and 1 bollard light; install ground rods for every light post.
$10KRelocate the feed pipe and wire for 100-amp service connected to the secondary side of the meter. This is from the meter pedestal to Boat Club. The pipe is being relocated so it is not under playground material.
$8K