Skip to content

Local provider profile

Michael Stake

Documented work across Connecticut based on attributed municipal records.

Reported work volume$33.5KDocumented jobs
Average project$3KWhere values are reported
First observed2019Available dataset
Categories1Observed work types
Used for work inStamford12 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

No contact information was found in the available records.

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 50 W Main St, Stamford, CTSatellite view
2026

50 W Main St

Stamford, CT
  • 2026Building Permit

    Install a 30' x 30' shade structure at the Mill River Park playground, including four footings.

    $25K
Satellite view of 1040 Washington Blvd, Stamford, CTSatellite view
2021

1040 Washington Blvd

Stamford, CT
  • 2021Building Permit

    As part of the Mill River Park temporary ice rink, install one 20' x 8' x 8'-6" office trailer (see attached specification) and one 20' x 8' x 8'-6" storage container (see attached image). The office trailer will be used by ice rink support staff and will not be open to the public. Ice skates will be distributed from the storage container, which can have one side entirely open. Power will be supplied from the temporary service in the park.

    $2.5K
  • 2019Building Permit

    Temporary tent for Zamboni storage at the ice rink, adjacent to the ice rink next to the grand steps. The tent is 16' W x 20' L x 14' H. Erect: 11/12/19. Remove: 3/1/20. Inspection: 11/15/19.

    $1K
  • 2019Building Permit

    A 40-by-70-foot tent located in Mill River Park adjacent to the fountain and ice rink. The tent has lighting and is to be used 7 days a week from November 1,2019, through March 31,2020, from 9:00 a.m. to 10:00 p.m. Erect 11/12/19; remove 3/1/20. Inspection: 11/15/19.

    $1K
  • 2019Building Permit

    As part of the temporary tent (B-19-734) located adjacent to the fountain, we would like to add use of the tent on Friday 9/27, Saturday 9/28, and Sunday 9/29. This is for a food event in the park occurring on 9/27 and 9/28. The event will run from 3 -10 on Friday and 12 - 9 on Saturday. The tent was already inspected under a closed-out permit; no changes were made, and the tent has stayed up.

    $1
  • 2019Building Permit

    As part of the temporary tent (B-19-734) located adjacent to the fountain, the request is to add use of the tent Friday 9/13, Saturday 9/14, and Sunday 9/15. This is for the food event occurring on 9/14 and 9/15 in the park.

    $1K
  • 2019Building Permit

    Add use of the temporary tent (B-19-734), located adjacent to the fountain, for Friday 8/23, Saturday 8/24, and Sunday 8/25, for the food event occurring in the park on 8/24 and 8/25.

    $1
  • 2019Building Permit

    (1)12 x 40 tents with no sides and EM/Exit Signs, (2)20 x 30 tents with no sides and EM/Exit Signs Event 6/15/19 "Pizza in the Park " Erect 6/15/19 Remove 6/16/19 Inspection 6/15/19.

    $1.5K
  • 2019Building Permit

    As part of the temporary tent located adjacent to the fountain, add use of the tent Monday through Friday, 7:00 AM–6:00 PM, for the summer camp running June 17th through August 10th. These hours will not be needed after August 10th. Included under B-19-734.

  • 2019Building Permit

    Permit issued under 2015 IBC Section 3103, Temporary Structures, for a period of less than 180 days. Temporary 40' office trailer for Land Care staff only. No public access or use.

    $500
  • 2019Building Permit

    Install a 40/70 tent with lighting. Seasonal tent: 5/14/19 to 10/14/19. Summer camp program: 6/17 through 8/9. Occupancy: 100 max (90 children, 10 adults), per posted furniture layout. For Tuesday night events: group bean bag tossing league layout with 20 2'x4' boards, per posted furniture layout. Erect: 5/14/19. Remove: 10/15/19.

    $1
Satellite view of 30 W Broad St, Stamford, CTSatellite view
2019

30 W Broad St

Stamford, CT
  • 2019Building Permit

    Change of use of the Carousel Pavilion to allow use for an after-school program for school-age children ages 5 through 12, Monday through Friday from 1:00 PM to 7:00 PM. The Carousel Pavilion will be closed to the public during this time.

    $1K