Covered porch in the back of the house over the existing patio. State education fee: $13. Electrical: 10 devices; wire 8 recessed lights and 1 fan in the covered patio, according to plan and code.
Remodel of the kitchen, master bathroom, and powder room according to plans. Replacement of misc. Windows and doors, according to plans. Electrical and plumbing according to the plans. State ed fee $39 HVAC: relocate existing radiator to new location and add 1 kick space heater in kitchen HVAC (2): set 55 AG tank against house and run line on house for stove and grill PLUMB: reset plumbing fixtures: first floor: replace 2: water closet, replace 1: shower, dishwasher, replace 3: sinks electrical: wire kitchen, 2 bathrooms., and family room lights; service change 100-amp to 200-amp o.h. service.; 1: rng., oven., air conditioning motor, oilbnr., circulator motor, dishwasher, wtr. Htr., gas burner motor.
Second-floor bathroom remodel, electric fireplace installation, and miscellaneous laundry remodel. State education fee paid: $6.50. Plumbing on the second floor: replace 1 water closet, sink, and shower. IPC, IRC.
Renovation · 2020$25,000
Second-floor bathroom remodel, electric fireplace installation, and miscellaneous laundry remodel. State education fee paid: $6.50. Plumbing on the second floor: replace 1 water closet, sink, and shower. IPC, IRC.
Remodeling of existing second floor bath. New plumbing, fixtures, tile, electrical, sheetrock, trim and windows. State Ed Fee Paid $7.80 PLUMB: Second floor: 1 water closet, tub, shower, 2 sinks electrical: 14 devices installed; wire bathroom with: 6 3-way switches, 2 20-amp outlets on dedicated 20-amp circuit - GFT; 5 recessed lights, 1 fan.
Renovation · 2018$100,000
Remodel of the entire kitchen and upstairs hall bathroom. New plumbing and electrical fixtures, cabinetry, stonework, sheetrock, flooring, and appliances. State education fee paid: $26.00. Plumbing: First floor–replace 1 sink and dishwasher. Second floor–replace 1 water closet, tub, and 2 basins; install new gas line for new stove and fireplace. Electrical: 43 devices installed; 1 oven, dishwasher, and microwave.
Remodel master bathroom with new plumbing and electrical fixtures, new tile and vanity, and all new finishes. State education fee paid: $5.20. Plumbing on the second floor: replace 1 water closet, tub, and basin. Electrical: 9 devices installed; renovate master bathroom with 3 recessed lights, 1 vanity light, 1 exhaust fan, 3 switches, and 1 GFI receptacle.
Renovation · 2016$50,000
Kitchen remodel with new cabinets, flooring, electrical, plumbing, and new appliances. State education fee paid: $13.00. Electrical: Kitchen renovation; add 7 recessed lights, 14 receptacles, and 5 switches. Plumbing: First floor; replace 1 sink and dishwasher.
Remodel and alteration of the kitchen, powder room, and mudroom; new cabinets, appliances, electrical work, lighting, and plumbing. State education fee paid: $20.80. Plumbing, First floor: 1 new water closet, shower, and dishwasher; move 1 shower and icemaker. Amendment (4/3/17): install 1 new gas line for new stove; gas outlet at the back right corner of the house (location for stove, kitchen). Electrical: 40 devices installed; 1 range, dishwasher; 12 recessed lights, 12 switches, 8 receptacles, and new appliances.