Combine the kitchen and dining room by removing two small non-load-bearing interior walls and one load-bearing interior wall, following the plan prepared by a structural engineer and included with this application. Work includes installing temporary support walls and a new structural beam designed by an engineer. Add a 500-gallon underground liquid propane tank. Replace the 16' x 16' rectangular deck at the rear of the dwelling with a 16' x 20' rectangular deck in the same location.
Demolish the existing kitchen and install a new kitchen (renovating the entire kitchen per plans: MK). On 2/3/2022, an air conditioning system was added to the scope of work. MTC.