2215 Summer St
Stamford, CT- 2020Electrical
Install electric vehicle charging equipment at 8 parking stalls at Ridgeway Shopping Center.
$250K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Install electric vehicle charging equipment at 8 parking stalls at Ridgeway Shopping Center.
$250KProposed interior tenant fit-out on the fifth floor, Wexford as tenant. Plan amendment to extend the corridor by 5'-6", add 3 sprinkler heads, and add 2 new lights.
$765KRenovation of the management office, cleaners' locker, and storage on the second floor.
$300KTemporary trailer (Airstream Bar) at 677 Washington Blvd. Event to start on 5/30/2021 and run through 10/30/2021.
$1KProposed new shaft for a future freight elevator, loading dock, and machine room. 3-11`-2020: Drawings submitted and approved to show changes to the elevator machine room and elevation stop changes at the 5th and 6th floors. This work applies to freight elevator shaft work only.
$850KRenovation of the 9th-floor elevator lobby, corridor, and restrooms.
$200KInstall new windows in the pavilion on the 6th and 7th floors. Application withdrawn. BG 7 7 2020.
$65KProposed ninth-floor tenant interior fit-out.
$1.5M140465 (B-19-1817): Proposed sitework, relocation of an existing curb cut to serve a new loading dock and driveway.
$25KReduce the 9th floor to core.
$100K139751 (B-19-1617): 2 new passenger elevator shafts in Pavilion Atrium.
$850KRenovation of the 5th-floor elevator lobby adjacent to the new cafeteria.
$50KRenovation of 5th-floor office tower restrooms.
$40KProposed new elevator shaft, curb cut, loading dock, and driveway. Made in error. Applicant changed 7/19/19. Asked to be made inactive. SMP. See TB-19-1817.
$1M2020 exterior beer garden, no tent. 04-30-2020 HJP. Terms of this permit: opens 05-30, closes 10-30, with removal on 10-31.
$10KRenovation and re-demise of the marketing suite into two suites on the second floor.
$55KRenovation of the Ardsley tenant space and partial fourth-floor common corridor at 262 Harbor Drive. Permit reissued with amended drawings. Scope of work greatly reduced. New contractor has provided COI and license. 10-22-20 HJP.
$300K2019 exterior beer garden, no tent. Location: 290 Harbor Drive. Permit to be issued for not more than 180 days. Event dates: start 8/5/2019, end 10/27/2019; removal 10/28/2019.
$10K2019 exterior beer garden, no tent. Location: 290 Harbor Drive. Permit to be issued for a period not to exceed 180 days. Event dates: Start: 5/1/2019; end: 10/27/2019; removal: 10/28/2019.
$10KInterior renovation of an existing office space on the third floor for Jefferies and Companies, Inc., as tenant.
$68K