6 Baldwin Farms S
Greenwich, CT2 jobs on recordAlteration
$25KView all 2 jobs
- 2026Renovation
Alteration
$25K - 2026Renovation
Alteration
$10K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Alteration
$25KAlteration
$25KAlteration
$10KHVAC Work
HVAC Work
Electrical Work
Alteration
$800KAmendment Alteration Res
$50KAmendment Alteration Res
$50KAlteration
Electrical Work
ELE
Enclose existing carport for garage. Second floor additions and interior alterations. State ed fee paid $104.70 electrical: wire new area per code NEC; 40 switches, 60 outlets, and 87 light fixtures. Electrical (2): install low voltage residential burglar alarm system with smokes, heats, co2 dets., water and temp. protection PLUMB.install new plumbing throughout dwelling; gas piping to 1: kitchen stove, 1 LR fireplace, 1 boiler; Basement: 1 nw: water closet, shower clothes washer, 2 nw hose bibs, 3 nw: sinks; First floor: 1 nw: water closet, tub, shower, bidet, 2 nw: sinks; Second floor: 3 nw: water closets, sinks, 2 nw: tubs, 1 nw: shower HVAC: install hydro air hndlr. For part of second floor. (1 unit already exists); install hydro air handlr. For first floor.; condenser already exists; install boiler to service each air handlers and indirect.
$403KInterior alteration to the existing lounge space under the International Building Code (IBC). New finishes, a new ceiling, bar area alteration, new doors, new millwork trims, and new lighting. State education fee paid: $65. HVAC: Miscellaneous interior ductwork and alterations to accommodate interior renovations for Elmer's Lounge, including ductwork, registers, and grills; relocation of the thermostat control; and replacement of the broken air handler. Piping is not included. Plumbing: First floor: 2 new sinks and 3 new floor drains for bar indirect waste piping. Electrical: 45 devices installed; install lights, plugs, dimming controls, 2 exit signs, and 2 recessed lights that will also be emergency lights as per the Fire Marshal. Install a subpanel in the back hallway with a 60-amp main breaker. Work is in Elmer's Lounge Room. Install speakers. Electrical (2): Install 2 smoke detectors at Elmer's Bar in the main clubhouse (low-voltage work).
$250KRenovation of existing Detached Accessory Garage : Interior and exterior alterations Reframed on existing foundation State Ed. Fee paid.: $52.00 HVAC: Carrier furnace and condensing unit and cooling coil (room over garage) PLUMB: basement: 1 water closet, basin, shower, sink, hose bibs; gas line for water htr., furnace, fireplace; new gas line from meter to bulding; new water service unit form main house electrical: 60 devices, 1: gasbrnr. Motor; wire new barn; 100-amp single-phase feeder. Amendment (8/28/18): 30 devices installed; wire barn with second floor. Office and 100-amp underground feer ELEC2: install audio/video jacks, security cameras and network ability.
$200KNew construction of a barn with 14 open horse stalls, 2 open wash stalls, and 1 track stall. Hay and bedding/grain storage rooms and an enclosed storage loft; office, laundry, tack room, and groom's lounge. State education fee paid: $650.00. In accordance with Section R314.2, CSBC, the household fire alarm system installed under this permit is required to be owned by the owner. The owner is responsible for having the system maintained in accordance with NFPA 72 and monitored by an approved supervising station in accordance with NFPA 72.
$2.5MNew construction of a barn with 14 open horse stalls, 2 open wash stalls, and 1 track stall. Hay and bedding/grain storage rooms and an enclosed storage loft; office, laundry, tack room, and groom's lounge. State education fee paid: $650.00. In accordance with Section R314.2, CSBC, the household fire alarm system installed under this permit is required to be owned by the owner. The owner is responsible for having the system maintained in accordance with NFPA 72 and monitored by an approved supervising station in accordance with NFPA 72.
$2.5MNew construction of a pump shed. State education fee paid: $65.00.
$250K3 Car Garage, 2 Horse Stalls, and 1 Muck/Dumpster Area State Ed. Fee paid.: $78.00. Amendment (7/2/18): 25 devices installed; rough in wiring for new garage, lights, devices, switches, meters, subpanel.
$300KNew construction of a barn with 14 open horse stalls, 2 oOen wash stalls, and 1 track stall. Hay and bedding/grain storage rooms and an enclosed storage loft; office, laundry, tack room, and groom's lounge. State education fee paid: $650.00. Electrical: 100+ devices installed; foundation only for stair and ground work.
$2.5M3 Car Garage, 2 Horse Stalls, and 1 Muck/Dumpster Area State Ed. Fee paid.: $78.00 PLUMB: First floor: 1 nw: sink, 4 nw: floor-drns.underfloor and water service.
New construction of a perimeter stone wall at the riding area. State education fee paid: $130.00.
$500KNew Construction of a Barn with 14 Open horse stalls, 2 open wash stalls, 1 track stall. Hay and bedding/grain storage rooms and enclosed storage loft; Office, laundry tack room and groom's lounge. State Ed. Fee paid.: $650.00 PLUMB: First floor: 2 nw: water closets, basins, clthswshrs., 1 nw: shokwer, 3 nw: sinks; 10 trench drains, 21 floor-drns.; water service; underfloor. Amendment (6/15/18): First floor: 2 nw: water closets, basins, clthswshrs., 1 nw: shower; 3 nw: sinks 10 trench drains, 21 floor-drains., 24 hose bibs; 1 120 gallon. Water htr.l; trap primers for 21 floor-drains. PLUMB (2): water storage tanks for fire suppression PLUMB (3): install new fire sprinkler system per NFPA #13, 2010 HVAC: install all related pex radiant floor tubing and ductwork HVAC (2): 2000 gallon. Lp underground tank and gas line to building PLUMB (2): water storage tanks for fire suppression electrical: 100+ devices installed; foundation only for stair and ground work. Amendment (7/2/18): 500 devices installed; 1: rng., dishwasher, clthsdryr, wellmp., 3 air conditioning motors 1800-amp service/3124674.
$2.5MNew construction of an open pool pavilion with roof and two enclosed changing rooms. State education fee paid: $61.10. Electrical: 10 devices installed; footing/foundation grounds and conduit runs for power. Electrical (2): 60 devices installed; 1 clothes dryer, dishwasher, and gas burner meter; wire pool house. Amendment (8/10/18): 4 devices installed; 400-amp service, overhead, single-phase. Plumbing, First floor: 1 water closet, basin, sink, and hose bib; foundation only. Gas line for barbecue and fireplace.
$235KNew construction of an open pool pavilion with roof and two enclosed changing rooms. State education fee paid: $61.10. Electrical: 10 devices installed; footing/foundation grounds and conduit runs for power. Electrical (2): 60 devices installed; 1 clothes dryer, dishwasher, and gas burner meter; wire pool house. Amendment (8/10/18): 4 devices installed; 400-amp service, overhead, single-phase. Plumbing, First floor: 1 water closet, basin, sink, and hose bib; foundation only. Gas line for barbecue and fireplace.
$235KNew construction of an open pool pavilion with roof and two enclosed changing rooms. State education fee paid: $61.10. Electrical: 10 devices installed; footing/foundation grounds and conduit runs for power.
New construction of an open pool pavilion. State education fee paid: $13.00.
New construction of an open pool pavilion. State education fee paid: $13.00.
New construction of an open pool pavilion. State education fee paid: $13.00.
$50KAdd exterior firebox and hearth to existing chimney. State education fee paid: $1.56.
$6.2K