Documented work across Connecticut based on attributed municipal records.

Reported work volume$694KDocumented jobs
Average project$86.7KWhere values are reported
First observed2023Available dataset
Categories3Observed work types
Used for work inStamford3 jobsGreenwich2 jobsDarien1 jobsTrumbull1 jobsWilton1 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

Phone
203-435-3640source record

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 305 Turn Of River Rd, Stamford, CTSatellite view
2025

305 Turn Of River Rd

Stamford, CT
  • 2025Renovation

    Alter Verizon telecommunications equipment on a monopole tower. Remove 8 antennas, 12 RRHs, 1 OVP, and 6 1-5/8" coax cables. Install mount modifications, 16 antennas, 16 RRHs, 1 OVP, 1 1-5/8"/6-by-12-foot hybrid cable, and 4 diplexers. Existing 1 OVP and 2 6-by-12-foot hybrid cables to remain.

    $40K
Satellite view of 69 Guinea Rd, Stamford, CTSatellite view
2025

69 Guinea Rd

Stamford, CT
  • 2025Building Permit

    Cellco Partnership d/b/a Verizon Wireless to replace and install antennas, ancillary tower and ground equipment at an existing unmanned wireless communication facility, with no change to structure height or ground space, per attached plans. This is an eligible facilities request.

    $40K
Satellite view of 100 Greyrock Pl, Stamford, CTSatellite view
2023

100 Greyrock Pl

Stamford, CT
  • 2023Electrical

    Install a Tesla electric vehicle charging station with 48 total DCFC “Supercharger” stalls. Posts will be installed behind existing parking curbs inside the garage of Stamford Town Center. The project includes 2 utility transformers, 2 3000A switchboards, 12 charge cabinets, and required raceway and conductors. The project will be constructed in phases. The first phase includes 24 stalls, 6 charge cabinets, 1 utility transformer, and 1 3000A switchboard. The building permit request is for the first phase; zoning approval is needed for the full project scope of 48 stalls. Amendment dated 11/13/2024: Reduced scope of work–24 EV charging posts (2 van-accessible ADA stalls).

    $339K