2026
6 22 2026 Trumbull
Trumbull, CT- 2026Mechanical
Contract for A tub was location of all details removed and a shower and new shower valve was installed in the the tub. A piece of baseboard heat was changed for cosmetic reasons.
$31K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Contract for A tub was location of all details removed and a shower and new shower valve was installed in the the tub. A piece of baseboard heat was changed for cosmetic reasons.
$31KInstallation of a hydro air heating and cooling system. Please see the attached contract for all details.
$27KSupplied in the mechanical print that is on file.
$659K