328 Ocean Dr E
Stamford, CT- 2026Renovation
Remodel the master bathroom and add an en suite bathroom, a second-floor laundry room, and a master closet. Remove the back staircase.
$110K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Remodel the master bathroom and add an en suite bathroom, a second-floor laundry room, and a master closet. Remove the back staircase.
$110KELE
HVAC Work
Plumbing Work
Electrical Work
Alteration Residential
$80KPlumbing Work
Plumbing Work
Plumbing for 4 new condos - 2 baths each - first floor- kitchen sink and dishwasher, , second floor - 1 bathroom (toilet, sink tub), third floor -, 1 bathroom, toilet sink and shower.
$35KInstall gas piping for 4 furnaces.
$4KSecond-floor 1 1/2-story addition including a bath, 2 bedrooms, laundry, and walk-in closet. Attic above for storage and mechanicals. New vinyl siding and windows at the addition. 1,120 SF. Bedroom on the first floor to be changed to living space open to the living room. 9/20/2023: New HVAC system added to the scope of work; cost increased by $22,400. MTC.
$150KFirst-floor kitchen remodel. Move kitchen cabinets, appliances, sink, electrical, etc., from the front of the house to the rear. Add structural LVL for wall removal.
$50KResidential additions and alterations.
$450KPLU
PLU
Plumbing for 2 new sinks on the second floor. For Bank; second floor. 2 new sinks.
1 ADA handicapped bathroom and 1 mop sink.
$3KUnderground only for future tenant: 1 ADA handicapped bath and 1 mop sink in janitor closet; 1 toilet, lav and mop sink.
$3KUnderground only for future tenant - 1 ADA/handicapped bath and 1 mop sink in janitor closet, 1 toilet, lavatory, and mop sink.
$3K1 ADA handicapped bathroom and 1 janitor sink, 1 water closet, lavatory and mop sink.
$6KADA-accessible bath, janitor mop sink, and water heater for Blackbear Wines.
$6KSmall 3 ft. Bump out addition with new kitchen and bathroom with new deck, revised 7/26/21 add 2 proposed condensers.
$1PLU
1 1/4 gas line to generator, underground piping.
Renovated house with new powder room, kitchen, gas stove, gas heater, gas grill, gas generator, gas dryer, and new laundry washing machine. Basement: 1 new clothes washer. First floor: 1 new water closet, dishwasher, and 2 new sinks. Amendment (4/29/21): 3/4 gas line to firepit, underground.
IMC. Install an ERV and VRF split system with 1 condensing unit and 2 air handlers, plus all related ductwork and plumbing. 2015 IECC.
Install plumbing for 1 new sink on the fourth floor; relocate hot water heater in ceiling.
Second floor: 1 new sink and relocate 1 laundry tub. Third floor: 9 new sinks. On the third floor, install 1 new sink and relocate on the second floor. Relocate drinking fountain, third floor.
First floor: 3 nw: water closets, basins, replace 1: water closet, basin; renovate and new install for 3 baths (handicapped); 1 new bath, 1 existing bath, renovate into 2 baths, 1 bath replacing fixtures.
New water and gas from main house to guest house; run new 1 1/2 waterline from existing house to new guest house underground; run new 1 1/4 gas underground from existing house to new guest house. Amendment (8/21/20): First floor: 2 nw: water closets, basins, hose bibs, 1 nw: tub, shower, sink, dishwasher, bidet, floor-drn; all underground plumbing water and gas; all above ground plumbing and gas for fixtures listed; all new underground plumbing for 2 nw baths., barsnk, underground water and gas; above ground plumbing for and gas for fixtures listed, 1: gas hot wtr. Htr., and 1 gas furnace, 1 gas barbecue.
Add new bathrooms, first floor. And bsement; new kitchen with dshwshrs.; new gas fireplaces, cooktop, barbecue, firepit; renovate first floor. Baths, powder room and master bath; Basement: 1 nw: water closet, sink, 2 nw: clthswshrs., 3 nw: hose bibs; First floor: 1 nw: water closet, tub, shower, 2 nw: dshwshrs., replace 1: shower, tub, replace 3: sinks, replace 2: water closets, 4 nw: sinks.
Basement: Install new bathroom with 1 toilet, l lavatory, 1 shower, 1 ejector pump 1 new bar sink no gas piping/no laundry room.
Install plumbing for Second floor: 2 bathrooms, 1 lobby sink, and 1 mop sink. Second floor: 3 bathrooms and 1 kitchenette. Relocate 1 storm/roof drain. Gas piping for boilers in basement and generator on roof. First floor: 2 new water closets, 3 new sinks, and 1 new urinal. Second floor: 3 new water closets and 4 new sinks.
1. Remodel and install new kitchen with mudroom area and separate zone for heating. 2 Remodel second floor bathroom and closet.
$50KPlumbing - 2 baths and kitchen first floor, 1 new bath with ejector and Hot water heater in basement.
$8KFirst floor: 2 new water closets, basins, dishwashers, 1 new sink, and 4 new hose bibs. Second floor: 5 new water closets, 6 new basins, 3 new tubs, showers, 1 new sink, laundry tub, clothes washer, and floor drain. Gas piping to 1 stove, boiler, dryer, 2 fireplaces, and 2 outdoor lanterns.
First floor: 1 new sink (kitchen) and ice maker.
First floor: 1 sink with pump.
Building. #1, third floor. Third floor.: 2 nw: water closet, basin, 1 nw: sink, dishwasher; 1 new icemaker.
Second floor: 1 new sink, dishwasher, and ice maker.
Plumbing: first-floor powder room; piping in basement. Must expose all plumbing.
$2KFirst floor: Replace 1 water closet and shower; replace 2 basins; 1 new tub.
First floor: 1 water closet, basin, sink, and hose bib; gas to unit heater on roof; underground.
Basement: sink and 1 mop sink. First floor: 2 new water closets, basins, 1 and 1 new sink, and 2 new sinks.
First floor: 3 water closets and basins; core and shell as per plans; 3 handicapped baths; water and fire service; all gas piping as per plans. Permit void – duplicate permit. Filed under 18-2210 and 18-3822.
Second floor: 17 water closets, basins, 12 tubs, 7 sinks, clthswshrs., dshwshrs., 7 residual units as per plans; all gas piping for dryers and boilers and hot water heater and cooktops.
Basement: 4 new water closets, basins, 1 new mop sink, urinal, and 2 new floor drains. First floor: 1 new sink and dishwasher. Second floor: 2 new water closets, basins, floor drains, 1 new sink, and urinal. Gas piping for 1 boiler and 3 RTUs, 1 drinking fountain, and 1 mop sink.
Mechanical: Gas to barbeque, fireplace, dryer, boiler, and stove.
$5KPlumbing - new 2 sty. Single-family residence.
$22KPlumbing - sewer.
$2KPlumbing: Remove and relocate toilets, lavatories, and urinals in the men's and women's rooms in the same locations; install waste and vents; make the final hookup for kitchen equipment; install floor drains.
$35KPlumbing for interior renovations to the existing “Bow Tie Movie Theater.”
$40KFirst floor: First floor: 1 water closet, basin, mop sink; 5 roof drains/1 trench drain, 1 basin, 1 1 1/2 backflow preventer.
Basement: 2 laundry tubs and 1 clothes washer. First floor: reset 1 water closet and basin. Second floor: 1 water closet, tub, basin, and floor drain. Add a floor drain in the laundry room.
Outside Kitchen: gas to firepit, barbecue, pizza oven. Terrace hookup ice maker, gas from house.
Second floor: 2 water closets, showers, basins, and 1 tub.
First floor: 2 water closets, showers, 3 basins, 1 tub.
First floor: move sink and dishwasher; replace clothes washer.
Land level: 1 water closet, basin, and 2 hose bibbs. First floor: 2 water closets, basins, 1 shower, sink, and dishwasher. Second floor: 4 water closets, tubs, 5 basins, 1 shower, laundry tub, and clothes washer. Above garage: 1 water closet, basin, and tub. Lower level: 1 sewage ejector pump. Gas to barbecue; 2 hose bibbs.
Replace air furnace, 125000 BTU.
$2.8KBasement: 2 water closets, 3 basins, and 1 shower. First floor: 1 sink and 1 wet bar with pump.
New House
$631K