199 Highland Ave
Norwalk, CT- 2025Plumbing
Rough + finish master bath 1 toilet, 1 shower 2 lavs.
$7K - 2025Plumbing
Move laundry machine waste and water.
$2.5K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Rough + finish master bath 1 toilet, 1 shower 2 lavs.
$7KMove laundry machine waste and water.
$2.5KAdd second floor washer hookup.
$1.5KPlumbing Work
Basement: 1 water closet, basin, and shower. Amendment (10/27/17): Basement: 1 water closet, basin, and shower; First floor: 1 water closet, basin, and dishwasher, 2 sinks, and hose bibs; Second floor: 3 water closets, 6 basins, 2 tubs, showers, 1 laundry tub, and clothes washer. All waste to be PVC plastic; all water to be CPVC plastic. Amendment (11/1/17): Water service from meter pit to house. Amendment (11/22/17): Gas piping for range, boiler, and 2 fireplaces.
Extend water and sewer lines to the new foundation; underground work only. Amendment (7/13/16): Reconnect gas line from the house to the garage.
Second floor: 2 water closets, tubs, 1 shower, 4 sinks.