8 Encampment Pl
Ridgefield, CT2026Gas
Gas line to generator.
$1.5KLocal provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Gas line to generator.
$1.5KPlumbing - new bathroom and laundry on second floor - 1 toilet, 1 sink, 1 shower, and 1 washing machine.
$7KPlumbing: first floor — 1 kitchen sink, 1 dishwasher, 3 sinks, 2 toilets, 1 tub, 1 shower, 1 laundry (WM) — 2 sinks, 2 showers, and 2 toilets.
$19KPlumbing: first floor — 1 kitchen sink, 1 dishwasher, 3 sinks, 2 toilets, 1 tub, 1 shower, 1 laundry (WM) — 2 sinks, 2 showers, and 2 toilets.
$19KMechanical: gas piping to 1 boiler, 1 stove, and 1 BBQ.
$3KGas line to generator.
$1K