Kathleen Darling
Unknown
Permit Cooccurrence Statewide V1 · through 2026Local provider profile
Documented work across Connecticut based on attributed municipal records.
Verified relationships
Relationships appear only when supported by an identified source; they do not imply endorsement or current employment.
Unknown
Permit Cooccurrence Statewide V1 · through 2026Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Modify existing office space for a new tenant, including new office fronts, ceilings, lighting, and finishes, and rework existing electrical, plumbing, sprinkler, and HVAC systems to accommodate the new layout.
$265KModify the existing space to include a new office configuration, a new pantry, and new finishes. Rework the existing HVAC, sprinkler, electrical, and plumbing systems to accommodate the new layout. Work area: 3,015 SF.
$275KCommercial interior alterations, Level 2: 1,350 SF expansion of existing space to include a new conference room and open-area work with workstations on the south side of the 6th floor in ARGA. B-25-1659.
$102KLimited alteration to an existing 3,028 SF office tenant space on the 9th floor. No change to use, occupancy, or egress.
$122KNEIP – Vision Financial tenant space, third floor, 1010 Washington Blvd., 6,356 SF. Tenant improvement. Use group B.
$276KInterior alterations on the 6th floor for ARGA Investment Management.
$80.9KOffice fit-out for Mayborn on the 9th floor.
$395KInterior fit-out for Eze Castle Integration on the 7th floor.
$322KTenant fit-out including wine storage and wine testing rooms, typical office areas, and open workstations.
$200KRenovate the existing tenant space, including demolition back to the core and new drywall partitions to create offices, conference rooms, and a pantry. Provide new electrical, HVAC, plumbing, and sprinkler systems to accommodate the new office layout.
$225KExpansion of pantry and paint and carpet upgrades in 1/2 the space.
$44KThis is a commercial tenant fit-out for tenant Pac-Basin. This is a new permit for another 10th-floor tenant.
$99.3KFiling for 1010 Washington Blvd, 10th Floor. This is a commercial tenant fit-out for Two Wings.
$67.4KRenovate the 8th-floor elevator lobby.
$40.5KCommercial tenant fit-up.
$360KPlumbing Work
Electrical Work
Alteration
$70KCommercial additions and alterations.
$480KVanilla box for space X.
$43.4KVanilla box for space w.
$60.2KDeck replacement.
$20.3KRemodeling of the existing kitchen, including relocation and installation of a new window. Approximately 250 SF.
$55KSubdivide one 2,800 SF office space into two separate tenant spaces, Suite 201 and Suite 206.
$106KFlooring, ceiling, and wall finish upgrades for the 7th-floor lobby and bathrooms, including lighting, lavatories, toilet partitions, and accessories.
$90KDemolish existing offices to create open space, install new ceilings and carpet, apply paint, and expand the pantry.
$110KInterior alteration of an existing medical office space to add exam rooms on the fourth floor, Suite 401. Work area: 950 SF.
$123KInterior alteration of existing retail space to expand into adjacent space. Includes new ceiling tile and grid in the expansion portion.
$54.6KAlteration Level 2 to a one-story space. Scope includes construction of a new non-structural demising wall to separate Space 3 into a 1,500 SF tenant space. Tenant fit-out to be filed separately. Also known as # 1131.
$30KFull Kitchen Renovation. Removal of bearing and nonbearing walls and layout changes.
$19.5KEstablish a “Hybrid Retail” sales dispensary on the ground level, per Zoning Board approval ZB 223-15. Floor area: 2,450 SF.
$400KInterior painting and floor refinishing; updates to the existing master bathroom and family room bathroom; countertop replacement in the kitchen; installation of recessed lighting and gas log sets in two existing fireplaces; installation of two windows in the study; and miscellaneous interior door and trim replacement in select areas. All bathroom plumbing fixtures are going back in the same locations, with no changes to the layout. All interior walls and the existing room configuration will remain as is.
$219KRenovate the clubroom, 2,088 SF, on the first floor of Postmark Apartments.
$125KTenant improvement on the second floor, with an 8,055 SF work area. Occupancy Group B.
$200KRenovation and expansion for a 9,625 SF tenant space on the fourth floor.
$650K2,780 SF office tenant improvement on the second floor, B2R Consulting Engineers.
$180KInterior fit-out for a medical office.
$500KMinor alterations to the first-floor dental office.
$126KSecond-floor renovation and change of use to expand the Group A-3 assembly place of religious worship into the former business-use area. Assembly areas to be protected by a new automatic fire sprinkler system and separated by 2-hour fire-resistance-rated assemblies.
$150KFirst-floor tenant fit-out for KMF Construction dba Olympic Construction, 1557 SF.
$85.6KInterior Offices.
$65KSecond seating expansion for Iglesia De Cristo Elim.
$30KRock crushing lab renovations for Cytec Solvay Group.
$410KCommercial interior renovation (Phase 2), third-floor lab. Trades: electrical, HVAC, plumbing, sprinkler, and teledata.
$255KInterior renovations of existing offices, common areas, and restrooms.
$190KInterior Fit Out for new daycare facility, Cottontail DaycareRevisedIncludes a outdoor ramp and play area. Dated Jan 11,2023 MJS.
$500KAmenity area renovation of 15,000 SF on the first and fifth floors and roof of a 22-story residential building.
$345KBuild an elevator shaft and furnish and install an elevator, including all required electrical and structural work.
$100KAdd/Alt.
$240KRenovate 2 existing bathrooms. All fixture locations remain in the same location. Furnish and install new plumbing and electrical fixtures as needed. State education fee paid: $14.30.
$55KMiscellaneous interior renovations to the kitchen and addition of an elevator (elevator eliminated; letter in file 8/12/20). State education fee paid: $52.
$200KFirst floor: Demolish the package room, mail room, and lobby cabinetry; build a wall to separate the Leasing Office, Manager's Office, and Lounge; install new lighting, make HVAC alterations, apply finishes, install a water line to the Coffee Bar and banquette table, and install a new vestibule storefront entry. Second floor: Demolish the mail room, office, and storage area; build a new wall; install mailboxes and finishes. Fourth floor: Install new lighting and finishes in the fitness area. Fifth floor: In the Clubhouse, install new lighting and window seat benches. In the Kitchen, install water and waste lines for a sink, cabinets, and an island. On 8/31/2020, the applicant added scope of work from TB-20-1149 to this permit application. Pool area: Install 14 new light poles in existing locations and a gas firepit, connecting it with a T to existing gas lines feeding the pool barbecue. Replace and reconfigure the existing barbecue area. Add an ice maker and beverage center at the barbecue area; plumbing for the bar sink and ice maker will run through the garage, with supply tapped from an existing water fountain. Add string lights, with power for the string lights and barbecue equipment fed from the Clubroom Electrical room on the same floor. Install pedestal pavers at the sitting area. Lower-level seating area: Add string lights and install pedestal pavers at the sitting area.
$850KApplication made inactive; scope and payment transferred to TB-20-1033. Pool area: - Install 14 new light poles in existing locations. Install a gas firepit, connecting it to the existing gas lines feeding the barbecue at the pool with a “T.” - Replace and reconfigure the existing barbecue area. Add an ice maker and beverage center at the barbecue area. Plumbing for the bar sink and ice maker will need to be developed and run through the garage; an existing water fountain can be tapped for the supply. Add string lights. Power for the string lights and barbecue equipment can be fed from the Clubroom Electrical room on the same floor. Install pedestal pavers at the sitting area. Lower-level seating area: - Add string lights. Install pedestal pavers at the sitting area.
$150KStamford Police Station interview room renovation. PO #731848; Bid #S-6748. Trade permits required.
$55.2KInterior demolition only on the first, second, and third floors. State education fee paid: $11.18.
$43.2KBuilding
$177KBuilding
$86.4KBuilding
$50KBuilding
$141KBuilding
$11KBuilding
$142KBuilding
$262KBuilding
$10KBuilding
$203KBuilding
$356KBuilding
$206KBuilding
$336KRepair the exhaust shaftway in or over the vacant retail space. Final plans from FKA Architects are awaited and will be submitted for review as soon as they are received.
$18.7KReplace the existing ceiling in 1 office with acoustical tile and grid. Reuse existing lighting. State education fee paid: $3.12. HVAC: Install ductwork and diffusers to match new floor plans; relocate induction units for new offices; install City Multi for conference rooms; connect system to existing BMS. Electrical: Remove and re. Install 6 light fixtures.
$12KTenant fit-out on the third floor: demising partition. State education fee paid: $25.22. Amendment #1 dated 1.13.17: value $30,000; fee $497.80. Third-floor pantry.
$96.9KConverting a garage to apartment, (Single family to 2 family) 2nd story addition. State Ed Fee Paid $62.40 PLUMB: 1" water service. Amendment (10/9/19): First floor: 1 nw: water closet, basin, shower, kitchen sink, dishwasher, hose bibs; Second floor: 2 nw: water closets, basins, 1 nw: tub, shower, 1 nat. Gas tankless hot water heater, 1 furnace, 1 stove; natural gas piping.
Converting a garage to apartment, (Single family to 2 family) 2nd story addition. State Ed Fee Paid $62.40 HVAC: install new gas furnace and air conditioning for apt.; vent bath fans (gaslines by others) PLUMB: 1" water service. Amendment (10/9/19): First floor: 1 nw: water closet, basin, shower, kitchen sink, dishwasher, hose bibs; Second floor: 2 nw: water closets, basins, 1 nw: tub, shower, 1 nat. Gas tankless hot water heater, 1 furnace, 1 stove; natural gas piping electrical: 1: rng., oven, clthsdryr, air conditioning motor, dishwasher, gasbrnr. Motor, 2: circ. Motors; 200-amp proposed service (CRS NO. To be supplied; JV said can accept this way); complete wiring of house per 2017 NEC with arc faults as needed. Amendment (1/14/20): 400-amp service; 2 meter service upgrade to accommodate new dwelling.
$240KRenovate Kitchen and Relocate Powder Room State Ed. Fee paid.: $27.30 HVAC: replace hot water baseboard in kitchen; 2 hot water toe-space heaters HVAC (2): alter existing ductwork in kitchen; vent kitchen hood; install makeup air electrical: 20 devices installed; 1: rng., dishwasher; rewire existing switches and add new plugs to code with new lighting as per plan PLUMB: first floor: move 1: water closet, basin, replace 1: kitch. Sink, dishwasher Amendment (8/31/18): kitchen remodel: 1 stove, gas line (nat.); reconnect new stove.
$105KBuilding
$200KRenovate existing suite 103 for new tenant “Mendola Art”.
$20KFirst floor: interior demolition; bring back to core. State education fee paid: $45.50. Electrical: interior demolition and temporary lights. Electrical (2): remove audible/visual devices and associated cable. HVAC: demolish 3 existing split systems. Plumbing: demolish existing pantry piping on the first and fourth floors.
$175KKitchen renovation and family room addition. State education fee paid: $45.50.
Kitchen renovation and family room addition under the 2012 IRC. State education fee paid: $45.50. Inspections were made by the City of Stamford. A copy of the certificate of occupancy issued by the City of Stamford was submitted.
$175KBuilding
$139KBuilding
$260KBuilding
$138KBuilding
$272KBuilding
$925KBuilding
$1.5MBuilding
$76KBuilding
$135KBuilding
$40KBuilding
$125K