24 Berkeley St
Norwalk, CT- 2025Build Alt Comm
5 Multifamily residential units.
$1.4M
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
5 Multifamily residential units.
$1.4MConstruct an ADA ramp and stairs to access the landscaped garden and yard. Construct modular CMU retaining walls and a van-accessible parking berth. Install new handrails on the exterior exit stair to the gate exit. Permit B-23-1391.
$459KSuperstructure – New 2 story retail cannabis store with office spaces and drive thru for Shangri La Cannabis.
$1.1MF/O - Construct new 2 story retail cannabis store with upstairs offices – drive thru.
$600KInterior renovations to the existing school daycare area: remove the existing bathroom and prepare the existing playground rough grade.
$86.4K1. Minor demolition of an existing first-floor tenant space, approximately 7,380 SF gross. The space is vacated, and no known hazardous materials exist. The original space was constructed around 2007. Work also includes minor exterior demolition of the adjacent outdoor patio space and tenant façade. 2. New construction of the Puerto Vallarta tenant space per the construction documents, including the exterior façade and patio space. Trades include select demolition, masonry, custom casework, chair rail, crown, EIFS, roofing (metal coping), Frms/Drs/Hdwr, overhead door, glazing, metal dividers, drywall, plaster finish, FRP, ACT, wood ceilings, carpet, painting, wall coverings, green wall, toilet accessories, toilet partitions, signage (neon and custom), draperies, window treatments, plumbing, HVAC, and electrical.
$466KCorporate Interior build-out for business occupancy.
$200KInterior demolition of all walls and ceilings to the perimeter, except the elevator and stair core and restrooms. Tie up existing diffusers and install upright sprinkler heads.
$48KSeparate tenant spaces, install new ceiling in Suite 1C, and provide new MEP's as described on the drawings. 6/1//2020-Ceilings removed from scope, to be done under tenat fitout permit-MTC.
$67.8KRenovations to bathrooms in 36 apartments in the congregate building of Stern Village.
$178KBuilding
$112KBuilding
$831KBuilding
$1.4MBuilding
$575K