10 Norden Pl
Norwalk, CT- 2023Ele Alt Comm
Installation of two tier ladder rack system to existing above ceiling supper and installation termination and testing of Category 6A data and pre-terminated fiber optic cabling within customer cage on data center floor, all cables will be routed from cabinet to cabinet within the data center cage and external cables to outside cage are not in scope.
$136K - 2021Ele Alt Comm
Installation, termination, and testing of Category 6 cabling within (1) second-floor suite. All Category 6 cables will be routed and terminated within each suite.
$15.8K - 2021Demolition
Installation, termination and testing of Category 6 data - fiver optic and RG6 Coaxial cabling within new second floor suites as part of demo/renovation project; all cables will be routed and terminated within each suite; fiver and coax route to existing second floor closets.
$51.5K