5 Ter Ave
Greenwich, CT- 2020Mechanical
Provide 2 condensing gas furnaces with a new duct distribution system for heat only.
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Provide 2 condensing gas furnaces with a new duct distribution system for heat only.
Replace existing gas furnace and Dxeml serving second floor. Bedrooms (furnace in attic, 80%); replace condensint unit interconnecticut the dxcoil.
Replace existing boiler with 2 gas-fired boilers (Buderus). Receipt 20-2079.
$20KKitchen renovation: kitchen exh. Ductwork, makeup air, bath exhaust. Ductwork, relocate 2 supply air registers, modify reivin air in family room.
Modify existing supply air and return air ductwork for the renovated kitchen area; provide kitchen hood exhaust ductwork. Makeup air is not required; the exhaust fan is rated for 400 CFM.
IMC. Provide 2 condensing gas-fired furnaces and complete duct distribution systems serving the first- and second-floor area. ACCA Manual J.
All work as per plans and specifications on file: 3 Carrier hydro-air systems, 1 garage unit heater, 1 kitchen makeup air system, and 1 gas-fired boiler.
Replace the existing hydro-air system serving the second-floor area. Extend ductwork to serve the new master suite addition. Replace the existing hydro-air system serving the first floor and replace ductwork with new. Provide 4-head ductless split heat pumps. Radiators on the third floor; 2 radiators in the basement.
Gatehouse: Furnish and install a ductless split heat pump to serve the gatehouse. AKU to be a cassette type located within the ceiling.
$3.3KProvide gas furnace, 2nd and third floor. And air conditioning; provide cond. Gas furnace, first floor. And basement and air conditioning; dryoer vent, bath exst., ERV.
Modify and extend ductwork to serve the new addition and renovated rooms; relocate the air handler serving the second floor; reconnect hot water coils to existing hot water piping. Interior work.
Modify register and grille locations to serve the new partitions in the master suite. Relocate 2 condensing units about 10 ft. (one new, one existing). Replace 1 condensing unit serving the master suite.
Provide 1 central air conditioning system to serve the house.
$15KProvide a new duct distribution system to serve the renovated portion of the house; reconnect new piping, DX piping, and drain piping; bathroom exhaust. Ductwork quantity: 2. Provide a new variable-speed fan coil unit.
Provide condensing gas furnace and duct distribution system to heat the house.
Due to fire damage, replacing the existing first-floor air handlers; replacing the gas-fired boiler with a Burnham gas boiler; indirect hot water heater; new pumps (5). Interior only.
Provide new gas furnace and duct distribution system to serve newly finished third floor. Area; provide kitchen and exit M/P air; provide basement ductwork third floor. Bath.
Provide 2 gas furnaces, one to serve the second floor and one to serve the first floor; provide 1 ERV, kitchen exhaust, makeup air, dryer vent, and bath exhaust.
Modify ductwork per new partitions; create a 3-zone system; kitchen hood exhaust; utilize existing HVAC equipment, Carrier heat pump.
Furnish and install 1 gas-fired garage unit heater to temper the air in the garage.
Replace the existing heating and air conditioning system with a new system. Provide 2 condensing gas furnaces with air conditioning, new ductwork, bathroom exhaust ductwork, and kitchen exhaust ductwork.
Extend the existing supply air main to serve the new breakfast room addition; provide 3 supply air floor registers; utilize the existing HVAC equipment.
Provide 2 condensing gas furnaces, a central air conditioning system, kitchen hood exhaust, kitchen makeup air, bath exhaust, and a dryer vent.
Replace the existing gas-fired steam boiler with a hot water boiler: 173000 BTU. Provide 2 hydro-air heating and central air conditioning systems, one on the first floor and the second on the second floor.
$35KDetached barn: Relocate the existing S/A register to center on lights and door; provide new S/A registers to serve the new entry and bathroom. Utilize the existing HVAC system (propane gas furnace, central air conditioning).
Replace the kitchen hood exhaust with new; provide kitchen makeup air and relocate 2 ceiling registers in the renovated kitchen.
Old garage heated with cast iron radiation; new finished space with hydro-air heat.
Rec room: Convert the air conditioning system to a hydro-air system by adding a coil; modify or replace ductwork per new partition. Den: Relocate existing air handlers to closet; reconnect ductwork; add s/a and r/a to new den.
Modify and extend the existing duct distribution system; relocate PVC venting for 2 existing condensing gas furnaces; relocate 2 existing condensing units.
Provide 2 condensing gas furnaces; duct distribution system, bath exhaust., dryer vent, kitchen and exhaust, kitchen makeup air.
Modify existing HVAC to serve the renovated family room, specifically by providing new ductwork for 4 supply air registers.
Condensing gas furnace and 1 central air conditioning system (guesthouse).
Provide hydro-air heating for the library space. Amendment (11/16/18): Gas piping to serve the library; in addition, rough underground gas piping for future gas heating of the cottage.
Modify ductwork to serve foyer and to serve bathroom; replace existing oil-fired boilers (2), and indirect D. H. W. htr. With propane fired condensing gas boiler Amendment(9/26/17)Provide Hydro-Air Heating system.
Second floor: Utilize the existing HVAC system; relocate supply air and return air registers per new partitions. First floor: Utilize the existing HVAC system; extend ductwork to serve the new addition, and relocate sidewall registers and grills to the floor.
Relocate duct risers to accommodate a new bath on the first floor; install a bath exhaust; relocate the return and grille on the first floor.
Replace existing ceiling grills with slat grills; provide a zone of hydronic radiant heat to serve the bathroom.
Type B double-wall flue pipe for a new gas-fired domestic hot water heater (plumber installing). The new size is 7", replacing the existing 4" flue.
Relocate supply air registers due to new ceiling height in master ste.; relocate DX pipe and drain due to new ceiling height in master ste.
Bathroom exhaust ductwork; “rough” sheet-metal bond for future air conditioning. Heating: provide Combi gas boiler for d.n.w. needs and hydronic radiant heating of pool house.
2 geothermal systems.
Install a ductless split for the wine cellar.
Provide 1 condensing gas furnace with central air conditioning system to serve new second-floor area.
Provide bath exhaust for new powder room in foyer.
Interior work; specifications in file. Air handler units, rough DX pipe, condensate pipe, duct distribution system, bathroom exhaust ductwork, final controls, and rough gas pipe. No roof work; interior work only. Amendment (1/18/17): Roof work for a heat pump, removal of existing RTU, and a new rooftop unit (AAON).
Provide a dryer vent for the laundry room; extend the existing duct distribution system to serve the new master bath area; relocate existing supply air runouts to serve the new master walk-in closet.