33 Holcomb Ave
Stamford, CT- 2025Electrical
Units #1R and #2R were damaged by smoke and are being repaired. Unit #1R: Gut the kitchen and bathroom completely; insulate; rewire the electrical; install new plumbing, 5/8-inch sheetrock, and new kitchen cabinets; and update the unit to code. Unit #2R: Gut the unit completely; install new insulation; rewire the complete unit; install new plumbing and heating to code, new kitchen and bathroom fixtures and cabinets, and 5/8-inch sheetrock and trim; sand, prime, and paint to finish.
$50K