20 Westport Rd
Wilton, CT- 2025Commercial Building Permit Project Applic
Building
$250K
Local provider profile
Senior Superintendent · Pavarini Construction
Documented work across Connecticut based on attributed municipal records.
Enriched provider details
Supplemental data supplied by FullContact and stored separately from public records.
FullContact query stored 2026.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Building
$250KBuilding
$460KComplete gut and renovation of bathrooms on the second floor, west. State education fee paid: $72.02.
$277KInterior office pre-built for Suite 112C. State education fee paid: $111.80.
$430KWith 2018. Demolish existing space to “white box” for re-rental (terrace level). State education fee paid: $33.80. Receipt 20-0302. Electrical: 60 devices installed; demolish electrical and install temporary lights and fire alarm heats, speaker strobes. Plumbing: demolish drinking fountain, cap off and make safe; cap off plumbing to existing pantry sink; terrace level.
$130KDemo of Existing Area for new tenant, including a structural infill of a stairwell. State Ed Fee Paid $14.30 PLUMB: First floor: 2: demo; demo existing pantry sinks; cap and make safe plumbing pipes electrical: 40 devices installed; safe off of electrical for demolition of space for future tenant, including installation of temp. heat dets. For temp. fire alarm and misc. Temp. lighting.
$55KInterior alterations on the first floor (sw) for a tenant fit-out totaling 8,337 SF. State education fee paid: $127.14.
$489KDemolition of once-occupied office space to a white box, including demising walls constructed to make the space rentable. State education fee paid: $19.50.
$75KRenovation of West Lobby, including walls, floors, lighting, furniture, and all new finishes, etc. State education fee paid: $218.14.
$839KInterior alterations to the pantry and common area behind the gym at terrace level. State education fee paid: $49.92. Electrical: 28 devices installed; miscellaneous lighting apps for the pantry and common area behind the gym at terrace level.
$192KDemolish interior staircase and infill floor. State education fee paid: $24.44.
$93.9KLandlord infrastructure work in connection with tenant fit-out; no change in use, egress, or occupancy. State education fee paid: $81.38. Electrical: 6 devices installed; 2 air conditioning meters; wire HVAC units on roof. HVAC: Install air conditioning units and piping on roof.
$313KLessee: Jones Family Office. Partial renovation of the existing tenant office–Terrace Level. State education fee paid: $14.56. Electrical: 30 devices installed; miscellaneous renovations within the existing tenant space. HVAC: Furnish and install new RGD's; relocate existing RGD's; balancing; furnish and install new ductwork and diffusers for the new mechanical space.
$56.2KInterior alterations to the Terrace Level Corridor. State education fee paid: $15.34.
$59KInterior renovation to the first-floor corridor at West Lobby–add new tenant entry door. State education fee paid: $7.02. Electrical: 18 devices installed; new tenant lobby with lights, outlets, and controls.
$26.7KInterior renovation to the first-floor West Corridor. State education fee paid: $30.68.
$118KDemolish the existing ceiling and all pipes, ductwork, and wiring at the executive parking garage. State education fee paid: $32.50. HVAC: pipe and duct demolition. Electrical: existing electrical; demolition of garage electrical. 2 Install additional fire alarm devices in the parking garage, consisting of manual pull stations, heat detectors, smoke detectors, and speaker/strobes.
$125KSuite 100C. Demolition of existing vacant tenant space. State education fee paid: $19.24. Electrical: 75 devices installed; demolish existing space and install new light fixtures.
$73.8KLessee: XPO Logistics. Tenant fit-out of executive building 5 to accommodate XPO Logistics interior. Alteration only; no change in use, egress, or occupancy. State education fee paid: $1,112.80. Amendment #1: 1.24.17, fee $40, to update MEPs in connection with tenant fit-out.
$4.3MInterior renovations to the East Lobby under the 2003 IBC. State education fee paid: $111.28. Plumbing: Install sprinkler and fire protection system. HVAC: 3 fan coil indoor units; 1 VAV unit and 1 exhaust fan, all associated ductwork and diffusers; no outdoor equipment. Electrical: 40 devices installed: lights and receptacles in the lobby with new lighting and power.
$428KInterior alterations to the first-floor West Corridor. State education fee paid: $30.94.
$119KBuilding
$127KBuilding
$6.5MBuilding
$11.3MBuilding
$12.4MPhased Remodel of existing tenant space. State Ed Fee Paid $70.02 electrical: 60 light fixtures, 70 devices, 2 vav boxes, 3 appliances PLUMB: Second floor: 1 nw: sink, use existing h/w htr. Amend: 8.26.19 Relocate Spk heads.
$270KBuilding
$150KDemising wall on the third floor for tenant separation. State education fee paid: $2.60. HVAC: Furnish and install 82 fire dampers, RGD's, controls, and balancing. AMCI expansion. Electrical: 81 devices installed; drop down, then re. Install 81 2-by-2 fixtures on existing wiring at the existing location. Fixture removal is for ductwork modifications.
$10.3KBuild a drywall soffit and install an ACT hung ceiling within, including new lights and ductwork. State education fee paid: $16.12. Reactivate permit 4.5.18: $40. Electrical: 45 devices, 16 light fixtures, and lighting controls.
$61.9KInterior renovations to third-floor corridor. State education fee paid: $35.88. Amendment #1: 1.27.16, no value.
$138KLessee: Millenium Partners. Set up swing space in existing Suite 200 on the second floor. State education fee paid: $21.06.
$81KLessee: Millenium. Interior office fit-out on the third floor. State education fee paid: $364.00.
$1.4MBuilding
$4MBuilding
$78.7KLessee: Little John Interior renovations to existing Tenant on third floor To be done in Phases. State Ed. Fee paid.: $234.00 PLUMB: Third floor: 1 nw: sink 2 dshwshrs., 1 coffee maker electrical: 289 devices installed; 3 lighting (2.5), and Power. 960 (32); new lighting and power branch circuits; new fixtures; reuse old exist. circuiting and service equipment. Electrical (2): relocate due to office expansion: 2 card readers and locking devices; 1 intercom station; 2 alarm keypads; change 1 electric strike to mag lock electrical (3): 88 devices installed; 88 low voltage cat6 wiring locations; 58 locations at modular furniture and 30 locations at walls HVAC: revise existing ductwork and diffuser layout to conform to new partition arrangement and furnish and install 1 supplemental heat pump as per plans on file.
$900KLessee: Little John. Interior renovations to existing tenant on third floor, to be done in phases. State education fee paid: $234.00. Amendment #1: 4.25.18; value $7,500; fee $162.08. New glass doors and sidelight; relocate one office on the third floor.
$900KLessee: Cat Rock Capital. Partial alteration to existing tenant's space. State education fee paid: $7.54.
$29KRenovations to the existing “Coastal Orthopedic” on the first floor.
$48KBuilding
$326KInterior demolition on the fourth floor; no tenant at this time. State education fee paid: $5.72. Tenant fit-up will require separate building and trade permits.
$21.8KRenovate existing waterfall: cleanup, new tile, coping stones, and lighting at the existing water feature. State education fee paid: $47.58.
$183KBuilding
$6.6MBuilding
$163K