Skip to content

Local provider profile

Pavarini North East Const.

Senior Superintendent · Pavarini Construction

Documented work across Connecticut based on attributed municipal records.

Reported work volume$54.5MDocumented jobs
Average project$1.3MWhere values are reported
First observed2014Available dataset
Categories3Observed work types
Used for work inGreenwich30 jobsWilton12 jobsNorwalk1 jobs

Enriched provider details

Provider information

Supplemental data supplied by FullContact and stored separately from public records.

FullContact query stored 2026.

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

Phone
203-943-3446source record
Phone
203-515-0423source record
Phone
203-327-0100source record
Phone
203-661-0055source record
Phone
203-667-2220source record
Phone
203-940-4231source record
Phone
475-216-1613source record

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 1 American Ln, Greenwich, CTSatellite view
2020

1 American Ln

Greenwich, CT
  • 2020Renovation

    Complete gut and renovation of bathrooms on the second floor, west. State education fee paid: $72.02.

    $277K
  • 2020Renovation

    Interior office pre-built for Suite 112C. State education fee paid: $111.80.

    $430K
  • 2020Renovation

    With 2018. Demolish existing space to “white box” for re-rental (terrace level). State education fee paid: $33.80. Receipt 20-0302. Electrical: 60 devices installed; demolish electrical and install temporary lights and fire alarm heats, speaker strobes. Plumbing: demolish drinking fountain, cap off and make safe; cap off plumbing to existing pantry sink; terrace level.

    $130K
  • 2019Renovation

    Demo of Existing Area for new tenant, including a structural infill of a stairwell. State Ed Fee Paid $14.30 PLUMB: First floor: 2: demo; demo existing pantry sinks; cap and make safe plumbing pipes electrical: 40 devices installed; safe off of electrical for demolition of space for future tenant, including installation of temp. heat dets. For temp. fire alarm and misc. Temp. lighting.

    $55K
  • 2019Renovation

    Interior alterations on the first floor (sw) for a tenant fit-out totaling 8,337 SF. State education fee paid: $127.14.

    $489K
  • 2018Renovation

    Demolition of once-occupied office space to a white box, including demising walls constructed to make the space rentable. State education fee paid: $19.50.

    $75K
  • 2018Renovation

    Renovation of West Lobby, including walls, floors, lighting, furniture, and all new finishes, etc. State education fee paid: $218.14.

    $839K
  • 2018Renovation

    Interior alterations to the pantry and common area behind the gym at terrace level. State education fee paid: $49.92. Electrical: 28 devices installed; miscellaneous lighting apps for the pantry and common area behind the gym at terrace level.

    $192K
  • 2018Renovation

    Demolish interior staircase and infill floor. State education fee paid: $24.44.

    $93.9K
  • 2017Renovation

    Landlord infrastructure work in connection with tenant fit-out; no change in use, egress, or occupancy. State education fee paid: $81.38. Electrical: 6 devices installed; 2 air conditioning meters; wire HVAC units on roof. HVAC: Install air conditioning units and piping on roof.

    $313K
  • 2017Renovation

    Lessee: Jones Family Office. Partial renovation of the existing tenant office–Terrace Level. State education fee paid: $14.56. Electrical: 30 devices installed; miscellaneous renovations within the existing tenant space. HVAC: Furnish and install new RGD's; relocate existing RGD's; balancing; furnish and install new ductwork and diffusers for the new mechanical space.

    $56.2K
  • 2017Renovation

    Interior alterations to the Terrace Level Corridor. State education fee paid: $15.34.

    $59K
  • 2017Renovation

    Interior renovation to the first-floor corridor at West Lobby–add new tenant entry door. State education fee paid: $7.02. Electrical: 18 devices installed; new tenant lobby with lights, outlets, and controls.

    $26.7K
  • 2017Renovation

    Interior renovation to the first-floor West Corridor. State education fee paid: $30.68.

    $118K
  • 2016Renovation

    Demolish the existing ceiling and all pipes, ductwork, and wiring at the executive parking garage. State education fee paid: $32.50. HVAC: pipe and duct demolition. Electrical: existing electrical; demolition of garage electrical. 2 Install additional fire alarm devices in the parking garage, consisting of manual pull stations, heat detectors, smoke detectors, and speaker/strobes.

    $125K
  • 2016Renovation

    Suite 100C. Demolition of existing vacant tenant space. State education fee paid: $19.24. Electrical: 75 devices installed; demolish existing space and install new light fixtures.

    $73.8K
  • 2016Renovation

    Lessee: XPO Logistics. Tenant fit-out of executive building 5 to accommodate XPO Logistics interior. Alteration only; no change in use, egress, or occupancy. State education fee paid: $1,112.80. Amendment #1: 1.24.17, fee $40, to update MEPs in connection with tenant fit-out.

    $4.3M
  • 2016Renovation

    Interior renovations to the East Lobby under the 2003 IBC. State education fee paid: $111.28. Plumbing: Install sprinkler and fire protection system. HVAC: 3 fan coil indoor units; 1 VAV unit and 1 exhaust fan, all associated ductwork and diffusers; no outdoor equipment. Electrical: 40 devices installed: lights and receptacles in the lobby with new lighting and power.

    $428K
  • 2015Renovation

    Interior alterations to the first-floor West Corridor. State education fee paid: $30.94.

    $119K
Satellite view of N 77 Danbury Rd, Wilton, CTSatellite view
2019

N 77 Danbury Rd

Wilton, CT
  • 2019Bldg Comm-Alt

    Building

    $6.5M
  • 2018Bldg Comm-Alt

    Building

    $11.3M
  • 2018Bldg Comm-New

    Building

    $12.4M
Satellite view of 33 Benedict Pl, Greenwich, CTSatellite view
2019

33 Benedict Pl

Greenwich, CT
  • 2019Renovation

    Phased Remodel of existing tenant space. State Ed Fee Paid $70.02 electrical: 60 light fixtures, 70 devices, 2 vav boxes, 3 appliances PLUMB: Second floor: 1 nw: sink, use existing h/w htr. Amend: 8.26.19 Relocate Spk heads.

    $270K
Satellite view of 600 Steamboat Rd, Greenwich, CTSatellite view
2018

600 Steamboat Rd

Greenwich, CT
  • 2018Renovation

    Demising wall on the third floor for tenant separation. State education fee paid: $2.60. HVAC: Furnish and install 82 fire dampers, RGD's, controls, and balancing. AMCI expansion. Electrical: 81 devices installed; drop down, then re. Install 81 2-by-2 fixtures on existing wiring at the existing location. Fixture removal is for ductwork modifications.

    $10.3K
  • 2017Renovation

    Build a drywall soffit and install an ACT hung ceiling within, including new lights and ductwork. State education fee paid: $16.12. Reactivate permit 4.5.18: $40. Electrical: 45 devices, 16 light fixtures, and lighting controls.

    $61.9K
  • 2015Renovation

    Interior renovations to third-floor corridor. State education fee paid: $35.88. Amendment #1: 1.27.16, no value.

    $138K
Satellite view of 1700 E Putnam Ave, Greenwich, CTSatellite view
2018

1700 E Putnam Ave

Greenwich, CT
  • 2018Renovation

    Lessee: Millenium Partners. Set up swing space in existing Suite 200 on the second floor. State education fee paid: $21.06.

    $81K
  • 2018Renovation

    Lessee: Millenium. Interior office fit-out on the third floor. State education fee paid: $364.00.

    $1.4M
Satellite view of 8 Sound Shore Dr, Greenwich, CTSatellite view
2017

8 Sound Shore Dr

Greenwich, CT
  • 2017Electrical

    Lessee: Little John Interior renovations to existing Tenant on third floor To be done in Phases. State Ed. Fee paid.: $234.00 PLUMB: Third floor: 1 nw: sink 2 dshwshrs., 1 coffee maker electrical: 289 devices installed; 3 lighting (2.5), and Power. 960 (32); new lighting and power branch circuits; new fixtures; reuse old exist. circuiting and service equipment. Electrical (2): relocate due to office expansion: 2 card readers and locking devices; 1 intercom station; 2 alarm keypads; change 1 electric strike to mag lock electrical (3): 88 devices installed; 88 low voltage cat6 wiring locations; 58 locations at modular furniture and 30 locations at walls HVAC: revise existing ductwork and diffuser layout to conform to new partition arrangement and furnish and install 1 supplemental heat pump as per plans on file.

    $900K
  • 2017Renovation

    Lessee: Little John. Interior renovations to existing tenant on third floor, to be done in phases. State education fee paid: $234.00. Amendment #1: 4.25.18; value $7,500; fee $162.08. New glass doors and sidelight; relocate one office on the third floor.

    $900K
  • 2016Renovation

    Lessee: Cat Rock Capital. Partial alteration to existing tenant's space. State education fee paid: $7.54.

    $29K
Satellite view of 761 Main Ave, Norwalk, CTSatellite view
2016

761 Main Ave

Norwalk, CT
  • 2016Build Alt Comm

    Renovations to the existing “Coastal Orthopedic” on the first floor.

    $48K
Satellite view of 100 W Putnam Ave, Greenwich, CTSatellite view
2016

100 W Putnam Ave

Greenwich, CT
  • 2016Renovation

    Interior demolition on the fourth floor; no tenant at this time. State education fee paid: $5.72. Tenant fit-up will require separate building and trade permits.

    $21.8K
Satellite view of 1 Lafayette Pl, Greenwich, CTSatellite view
2016

1 Lafayette Pl

Greenwich, CT
  • 2016Renovation

    Renovate existing waterfall: cleanup, new tile, coping stones, and lighting at the existing water feature. State education fee paid: $47.58.

    $183K