20 Westport Rd
Wilton, CTCommercial Building Permit Project Application (Existing Buildings -additions/alterations) and Cellular Antennas
Commercial Building Permit Project Application (Existing Buildings -additions/alterations) and Cellular Antennas
Commercial Building Permit Project Application (Existing Buildings -additions/alterations) and Cellular Antennas
1 Market St
Darien, CTCommercial tenant fit-up.
Commercial tenant fit-up.
Commercial tenant fit-up.
677 Washington Blvd
Stamford, CTInstallation of retractable bollards at the entry drive.
Installation of a 140’ flag pole on top of an existing permitted structure.
In-kind repaving of the existing driveway, with minor adjustments to grading and planting for improved accessibility.
Phase 1: Install steel beams at the location of the proposed opening for an intercommunicating stair between the 11th and 12th floors at 677 Washington Boulevard in Stamford, CT. Remove a portion of the slab and install a temporary barrier on the 12th floor to prevent a fall hazard below. Phase 1 revised to include additional interior demolition: remove carpet tiles and rubber base, perimeter bulkheads, finishes in elevator lobbies, doors, and select interior column enclosures. DN 5/19/22. Phase 2: Build out the 11th- and 12th-floor interiors at 677 Washington Boulevard in Stamford, CT, for a corporate office. The build-out includes a reception area, intercommunicating stair, offices, workstations, meeting rooms, board room, studio, pantries, focus rooms, phone rooms, and similar spaces appropriate for general office use. The 12th floor also incorporates a retractable wall to the roof terrace. The floors will include new mechanical, electrical, plumbing, data, and security systems as required for operation of the new office space. Revised to convert Storage Room 1116 into Warming Pantry 1116. DN 7/22/22. 11/4/2022: OK to issue PCO for the 11th and 12th floors for all areas except the studio room and studio control room.
50 Danbury Rd
Wilton, CTCommercial Building Permit Project Application (Existing Buildings -additions/alterations) and Cellular Antennas
40 Heights Rd
Darien, CTCommercial tenant fit-up.
1 Station Pl Metro Center
Stamford, CTInterior tenant alteration on the fourth floor for Exodus Point Capitol. Work area 4,500 SF.
4 Star Point
Stamford, CTInstall 4 frameless glass doors on the fourth floor at various points.
Level 2 alteration for an interior office tenant space. Construct a conference room and pantry, and add two single-occupancy toilet rooms within the tenant space.
Interior renovation for Tenant Fit-Out of 5320 sf on First Floor.
Install Pre-Fabbed Restroom Pods in parking Garage and all MEP tie-ins.
208 Harbor Dr
Stamford, CTRenovate a 900 SF studio area on the fourth floor for CBS Studios at Unit 2. 5. 0 Harbor Drive.
Interior alteration to the existing third- and fourth-floor tenant space for CBS at 250 Harbor Drive. Work area: 2,077 SF.
Interior fit-out of 3029 SF on the third floor for STOKKE, also known as 262 Harbor Drive. All life safety systems and egress will be maintained throughout construction.
383 Main Ave
Norwalk, CTVanilla box 2 nd floor.
Tenant fit-up for the 5th floor “Protos Security.”
151 Greenwich Ave
Stamford, CTTenant improvement for Energos on the second floor of 100 First Stamford Place. Level 2 alteration. The area of the work is 3,161 SF. Occupant load of 22 persons.
Interior Alterations, millwork, door replacement.
Interior alteration and expansion of Use Group B offices on the fifth floor for Trexquant into existing vacant space. Expansion area: 5,461 SF.
Interior alterations to existing space.
Construct corridor and demising partitions to subdivide the west side of the fifth floor into 3 separate tenant spaces.
Interior renovation of existing space on the second floor. Demolish the conference room and modify the furniture layout.
Interior alterations to the tenant space on the second floor, including partial demolition of existing offices for open-area workstations and a new storage room and wellness room. All mechanical, electrical, and plumbing work is consistent with the plans. Life safety and egress will be maintained throughout construction.
Interior renovation of the demised tenant space on the second floor. Work includes a new conference room, offices, and a new open workspace layout. All mechanical, electrical, and plumbing work as required. Egress and life safety systems will be maintained during construction.
Interior renovations to include a new demising wall, a new egress door, and new corridor finishes. All life safety systems will be maintained during construction. Amendment 6.26.2023: Install a new door, frame, and hardware in the existing wall. Modify the corridor partition to accommodate the new location of the corridor door.
Interior alteration to existing space on the fourth floor, including office reconfiguration and a new Filr Room. All mechanical, electrical, and plumbing work is consistent with the project. All life-safety systems and egress will be maintained during work.
Interior alterations to the existing tenant space on the fourth floor.
Renovations to the existing first-floor West Public Restrooms.
Renovations to the fifth-floor east and west restrooms and the sixth-floor west restroom. Scope includes new plumbing fixtures, ceilings, lighting, and floor and wall finishes. The fifth-floor west restroom returns to its original layout.
Alter the existing demised tenant space into 3 new pre-built suites. Each suite will include offices, conference rooms, huddle rooms, a pantry, a copy room, an IT closet, and open space for workstations. All MEP work for each suite. Life safety and egress are to remain in use during construction.
Interior renovations to 2343 SF of the third floor for a prebuilt tenant space. All life safety systems and egress will be maintained throughout construction.
Interior alterations to tenant space on the second floor, including modifying the existing demising wall for reception, office, conference room, pantry, copy room, IT closet, and open space for workstations. All MEPs to be modified as required. All life safety systems will be maintained during construction.
Renovation on the third floor to prepare for tenant occupancy. Remove interior finishes. Renovate the elevator lobby with a new ceiling and lighting. All life safety systems and egress will be maintained during renovation work.
Interior alterations to space on second floor. All Life Safety systems and Egress will be maintained throughout construction.4,456 sf Tenant FSP Walleye 205 MJS Dated Jan, 21 2022.
430 Main Ave
Norwalk, CTRenovations to a commercial space/future tenant permit and signage required.
400 Washington Blvd
Stamford, CTInstall secondary Type 1 kitchen exhaust fan on the roof or Charter Tower 1.
Level 2 alteration on the third floor to construct classroom and meeting rooms. No structural modifications. Work area: 4,458 SF.
Charter Communications – 14th floor: Renovate the existing 650 SF private office to divide the space into a smaller office and a meeting room.
Interior upfit to be used as a clinic serving Charter employees only.
675 Connecticut Ave
Norwalk, CTSuperstructure for Wegman Food Market; final cost adjustment.
Superstructure for 551-space parking garage—final cost adjustment.
Retaining walls 1 and 2.
Superstructure for Wegmans Food Market- Amended 3/20/25 to include 2 elevators.
F/O – New Wegman’s Store.
Superstructure for a 551-space parking garage. Amended 3/20/2025 to include 2 elevators.
Phase III retaining wall.
F/O – Parking garage for 551 spaces.
Install 220 LF S. O. E. retaining behind Raymour and Flanigan.
677 Connecticut Ave
Norwalk, CTCost adjustment for the superstructure for a future tenant—shell only; no tenant fit-up.
Superstructure for a future tenant—shell only; no tenant fit-up.
Foundation only for a two-story building for business use.
601 Merritt 7
Norwalk, CTTenant fit-up, Commonfund, fourth floor.
Renovations for meyer on second floor-no expansion.
901 Main Ave
Norwalk, CTTenant fit up 8th floor, installation of new doors new millwork, relocate outlets ge aerospace.
In fill stairs (interior) for floors 3,4 and 5.
120 Long Ridge Rd
Stamford, CTFirst-floor interior demolition space (Gen-re). Work area 5,304 SF.
Remove two convenience stairways and close floor openings with new floor construction. Remove ceiling-mounted HVAC units. No change of use, egress, or occupancy. Group B.
Demolition and decommissioning work to return the space to the landlord as it was before the lease, including removal of the stairway and infill, changing lighting, and removing supplemental cooling. All office partitions and exit lights are to remain. All life safety is to be maintained throughout the work.
200 Elm St
Stamford, CTPhase 1 Reduce to core on floors 1,2 and 5. Total work area 56,150 SFPhase 2 Tenant improvements for Indeed on First, Second and Fifth floors. First floor Cafeteria and Prep Kitchen Group A-2, Meeting areas Group A-3, Offices Group B and Storage. First floor work area 16,668 SF 571 Occupants. Second Floor, construct offices and open work stations, meeting rooms and training rooms Use Groups B and A-3. Second Floor Work area 20,220 SF. 270 Occupants. Fifth Floor construct offices meeting rooms and open work stations. Work area 53,929 SF. 578 Occupants. Total project work area 90,817 SF.
Modify the existing room for video projection and screens. All life safety and egress will be maintained during work. Second floor, Room 208: MK.
707 Washington Blvd
Stamford, CTInterior alteration Floors 5,6 and 7. Installation of new doors with delayed egress or access controls. Changes to egress involving modifications to lighting, emergency lighting, exit sign locations, fire alarm devices and fire suppression devices.
Construct Site Monument.
429 Washington Blvd
Stamford, CTPrebuild Suites including Offices, Conference Rooms, Pantry, IT Closets and Open Workstations and Base Buildingilet Room. All MEP work consistant with overall scope. All Egress and Life Safety systems to remain operable during construction.
Interior alteration to the demised tenant space on the third floor (535 SF). Add 3 new offices and create a new layout for the reception area and open workstation space.
Reduce to core 17,589 SF on the 8th floor. Install general lighting throughout the floor. All life safety systems and egress will be maintained during work.
Level 2 renovation of the existing men's and ladies' restrooms on the south side of the third floor, and a new base building ADA restroom.
Interior renovation of 10,043 SF of existing tenant space on the third floor. Updated to note the company is Tweedy Browne. Noted 12/7/22: MK.
Interior alterations to space on the fourth floor (Suite 460) to create a pre-built tenant space, including offices, conference rooms, pantry, copy room, IT closet, open space for workstations, and a base-building toilet room. All MEPs are to be modified as required. All life safety systems and egress are to be maintained during construction. Revised work scope: Relocate the ADA bathroom, pantry, conference room, and copy room due to the post-tension cable system. MJS, dated 4/18/2023.
Build out an existing space into an IDF room, including adding two 7.5-ton HVAC units and temporary MovinCool air conditioning units to the existing space, relocating a UPS unit into the existing space, and installing high-temperature sprinkler heads.
Interior alteration to erect a demising wall and 2 code-required egress doors within the existing tenant space, separating the existing space from the new office suite.
Prebuild Suite 460, including offices, conference rooms, a pantry, a copy room, open space for workstations, and a base building toilet room on the fourth floor, and storage and a toilet room on the third floor. All mechanical, electrical, and plumbing work is consistent with the scope. All life safety systems will be maintained during construction.
Interior Renovation to existing Cafe, added Gaming Lounge to include Golf Simulator. Pool Table, Pantry and seating. Including MEP work as required. All Life Safety systems to remain operable during construction.Revised: Gaming lounge eliminated from scope of work DN 10.31.22Work reverted back to original scope. Gaming lounge to be included DN 12.19.22.
Interior fit-out of Suite 470 of 5958 SF, including offices, a conference room, a pantry, an IT closet, and open space for work stations. MEP work as required, with all life safety to remain active throughout.
Renovations to restrooms and corridor on the 8th floor South. New fixtures, lighting, floor and wall finishes, and MEP work consistent with the scope. All life safety systems will be maintained during work.
Prebuild Suite 305, including offices, a conference room, a pantry, an IT closet, and open space, with all MEPs as required. All life safety systems will be maintained throughout construction.
Interior renovation of office Suite 440 (1,429 SF), including relocation of some existing lights in the new layout, insulation added to existing walls, and MEP work as needed. All life safety systems to remain active during work.
Demolition of unoccupied space to a white box, Suite 110. All life safety systems to remain operational during construction.
Interior renovation to Suite 420 as a Prebuild.
301 Tresser Blvd
Stamford, CTAlterations to 2,050 sf existing office space on 15th Floor.
301 Merritt 7
Norwalk, CTTenant fit-up for “Terex Corp” and office renovation on the fourth floor.
Tenant fit up for “Terex Corp” – and office renovation - fourth floor.
163 Skymeadow Dr
Stamford, CTChange all windows to Energy Efficient windows, Patch Stucco as required, and recoat all.
400 Atlantic St
Stamford, CTTenant improvements on the 7th, 8th, and 9th floors. Total work area: 65,968 SF.
1 Blachley Rd
Stamford, CTRenovation of the existing coffee bar. Replacement of the existing millwork, food service equipment, plumbing fixtures, and lighting. No change of use or occupancy or use.
72 Cummings Point Rd
Stamford, CTInterior renovation of the existing space in the first-floor East Wing.
Interior renovation to the pantry on the first floor, east, including new furniture, lighting, and finishes. No changes to partition locations, plumbing fixture count, occupancy, or egress.
Interior renovation of existing office space. Scope includes replacement of existing finishes, furniture, glass office fronts, and light fixtures. No change to partition locations, plumbing fixture counts, occupancy, or egress. Amendment 4.28.23: The square footage has not changed. Move some walls to create more offices.
Interior renovation to the West Wing second floor. All life safety systems will be maintained during construction. Revised to add a bathroom renovation to the scope.
100 Tresser Blvd
Stamford, CTInstall interior tenant demising wall and exterior Canopy at retail promenade for Landlord.
Interior renovation of 7758 SF on the first floor includes infill of the loading dock door and new lobby, offices, meeting rooms, restrooms, and a break room. All associated mechanical, electrical, and plumbing systems and all life safety systems will remain functional during construction.
56 Top Gallant Rd
Stamford, CTConstruct a new main entry vestibule for the existing office building. No change to the building footprint or floor area.
1 Star Point