2024
11 19 2024 Ct
Trumbull, CT- 2024Electrical
Associated with existing mall.
$241K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Associated with existing mall.
$241KTesla proposes to install 12 electric vehicle charging stations, 1 utility transformer, 1 2400A switchgear, other ground equipment, and all associated underground conduit routing and site work.
$137KInstall underground conduit and wire to fuel tanks and overhead lube, consisting of power and low voltage.
$100K