14 St Johns Rd
Wilton, CT- 2026Mechanical
HVAC, Geothermal, Chimney liners & Oil Tank Permit WILTON
$11.7K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
HVAC, Geothermal, Chimney liners & Oil Tank Permit WILTON
$11.7KHVAC Work
$7.9KGas-fired hydro-air system with 2 fan coils and 3 zones.
New ductwork zone from the existing system for a new attic loft.
$5KReplace existing Remove existing gas furnace and CAC equipment roofing shingles and apply new GAF asphalt roof shingles with ice and snow.
$26.9KSix new indoor wall-hung units with two outdoor heat pump condensing units; new hyper-heat multi-zone system.
$25KNew one-to-one ductless mini-split installation.
$7KInstall 2 zone wall hung mini split ductless heat pump systems for 2n floor dwelling.
$8KAdd air conditioning to an existing furnace and ductwork system.
$8.8KMechanical: Replace the existing oil boiler with a new one.
$8KMechanical: New Hydro Air system on the second floor; add H20 coil to the existing first-floor system.
$19.8KDucted air conditioning with existing baseboard heat for cottage. Amendment (1/21/20): new gas combi boiler.
New ductwork to new mudroom areas.
Replace existing attic system.
Replace existing as boiler, hot water heater and hvac split system with new o.v. gas boiler, indirect hot water heater and corner split system, air conditioning, hydro-air, first floor. System only.
Replace attic ductwork for second-floor bathrooms and bedrooms.
Mechanical: New hydro air system.
$51.4KMechanical: New gas-fired hydro-air system, boiler.
$44.2KReplace existing gas-fired HVAC system with new Carrier; complete new second-floor system in attic with ductwork.
New gas fired hydro air hvac system with 4 a/h.
Remove and replace the gas furnace with a hydro-air system, crawl space fan, coil, temporary boiler room with indirect hot water heater. First-floor system only.