66 Wynnewood Ln
Stamford, CT2 jobs on recordThe third floor was intended and built to house the house’s 3rd and 4th bedrooms. All plumbing, electrical, and HVAC were set up for finishing. The house septic system was originally installed for 4/5 bedrooms. I intend to use family licensed trade people (plumbing and electrical) to keep costs low. The work will also include adding a propane-fueled generator and two above-ground 120-gallon AG tanks.
$10KView all 2 jobs
- 2020Mechanical
The third floor was intended and built to house the house’s 3rd and 4th bedrooms. All plumbing, electrical, and HVAC were set up for finishing. The house septic system was originally installed for 4/5 bedrooms. I intend to use family licensed trade people (plumbing and electrical) to keep costs low. The work will also include adding a propane-fueled generator and two above-ground 120-gallon AG tanks.
$10K - 2020Mechanical
The home has an unfinished third floor and was planned as a 4/5-bedroom home, inclusive of the septic. All plumbing, electrical, and HVAC connections are in place. I plan to complete it using licensed family and friends.
$10K