Remodel the kitchen, keeping the cabinet layout the same as the original. Remodel 2 bathrooms, keeping the fixture layout the same as the original, and replace windows. Install a new heating system powered by propane, with AC condensers.
Remodel the kitchen; remove 3 load walls (kitchen, living room, and 1st-level bedroom); remodel bathrooms on the 1st and 2nd levels; replace windows and doors; add onto the existing dormer (rear 2nd level); add a half bathroom on the 1st level; replace roofing shingles; and add a new HVAC system and condenser unit. 12/11/2019 LJ reverted for propane tank location approval.