51 Schuyler Ave
Stamford, CT2025Renovation
Bathroom alteration: Replace the vanity and sink, replace the toilet, and remove the existing bathtub and replace it with a walk-in shower using existing drainage.
$23KLocal provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Bathroom alteration: Replace the vanity and sink, replace the toilet, and remove the existing bathtub and replace it with a walk-in shower using existing drainage.
$23K