400 Atlantic St
Stamford, CT- 2026Building Permit
Interior tenant installation for Standard Company to occupy the entire 14th Floor. Work area 28,749 SF.
$5.5M
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Interior tenant installation for Standard Company to occupy the entire 14th Floor. Work area 28,749 SF.
$5.5MInterior tenant fit-out on the third floor, including partitions, 18,060 SF.
$2.6MInterior alterations to the 11th floor to convert one large office space into three small cubicles.
$75KInstall 8 new EV charging stations in the parking garage.
$90KTenant fit-out of the 11th floor, including new drywall, ceilings, MEPS, lights, and architectural finishes.
$3.5MReduce to core for future tenant fit-out on the 11th floor.
$225KInterior fit-out for future tenant (Silver Point capitol) on the 7th floor. OK to issue PCO upon passing electrical inspection. Full COA upon installation of glass doors and other areas as per uploaded documents.
$1.1MFuture tenant fit-out for Tremblant on the 8th floor.
$675KInterior alterations to the 8th-floor restrooms.
$395KInterior renovation to the existing lobby.
$30KInterior renovations for a fitness center on the 5th floor. Approximately 8,542 SF. Occupant load is 162. This project will also require electrical, plumbing, HVAC, and sprinkler permits.
$1.7MRenovation of existing space into a new tenant suite. Revised plans approved showing minor layout changes under Bulletin #1 dated 1/6/19.
$1.5MRenovation of the first-floor men's and women's toilets; 452 SF work area.
$178KInterior renovations to elevator lobbies and corridors on 1st, 3rd, and 4th floors.
$200KInterior-only fit-out for future tenants on the third floor. Subdivide the existing 7,046 SF space into two pre-build spaces.
$400KRemodeling of existing bathrooms on the third floor of building #250.
$100KPerform miscellaneous demolition, electrical work, finishes, and landscaping for the installation of new architectural panels and a seating area.
$300KInterior alterations to the third floor, including a demising wall and doors.
$55KRenovate fourth-floor restrooms.
$120KExterior improvements to the green court at Shippan Landing include converting a concrete parking deck into a planted pedestrian area and improving stormwater retention and filtering. Revised for site and parking changes. Amended plans to be attached. DN 3.10.21.
$3.2MExpand and refinish the main and lower lobby at building 208, including a new storefront and new floor and wall finishes. This project will also require electrical, sprinkler, HVAC, and fire alarm permits. CD, cost affidavit, and letter of compliance required for COA.
$1.2MExpand and refinish the main and lower lobby at building 262, including a new storefront and new floor and wall finishes. Cut back the slab to create a double-height space. This project will also require electrical, sprinkler, HVAC, and fire alarm permits. CD, cost affidavit, and letter of compliance required for COA.
$1.3MExpand and refinish the main and lower lobby at Building 250, including a new storefront and new floor and wall finishes. Revised to exclude the upper-level elevator lobby renovation. DN 6.16.21.
$1.1MInterior renovation of the lower lobby at building 290. Area: 400 SF. Framing: no. MEPs.
$22KExpand and refinish the main lobby to buildings 208,250 and 262. Including new storefront, new floor and wall finishes typical for all three lobbies. Cutting back the slab at Lobby 262 to create a double height space. Refinishing lower level lobby to buildings 208,250,262 and 290. Separate permit application is required for each building. Tis application has been made inactive. BG.
$3.4MInterior Renovations to 262 HARBOR DRIVE 3rd and fourth floor for existing bathrooms. Trades needed for this permit: electrical, mechanical plumbing and sprinkler.
$200KInterior renovations for tenant fit-out for “Kantar”: pantry, training room, lounge, and offices.
$375KInstall 14 auto charging stations, a new transformer, a new electrical panel, and required conduits. No disturbance of the slab and no excavation work will be performed.
$95KInstallation of rooftop equipment and structural anchors for swing scaffolding.
$100K6th and 7th floors tenant fit up for "Financial Accounting".
$18.3MCreate a future tenant fit-out for Insight Global on the third floor.
$700KInterior renovation and expansion on the fifth floor of Metro Center. Unit 5. 0. 1 is expanding into Unit 5. 0. 3.
$911KInstall a 40-by-60-foot tent for a graduation party, daytime only, with no lights.
$5KInterior renovation of existing office space.
$98KInterior alterations to the existing office, including lighting upgrades, a new pantry, and new finishes.
$175KFourth-floor Phase Three: Remove a pantry, add a door, and change 2 other doors. Paint and install carpeting on the fourth floor. Add a subpanel and circuits for workstations, and demolish the pantry. This project will also require electrical and plumbing permits.
$40KPartial fit-out for future tenant XFL, including new lighting, floors, electrical, and ceiling grid. Tenant: Carl Pombar. Fifth floor, 15,467 SF. Trades needed for this permit: electrical and sprinkler.
$851KReduce to core floors 12 and 13 (Vanila Box).
$150KInterior alterations for office space-14; 000 SF.
$1.3MInterior alterations for an exercise room for ROWHOUSE.
$200KInterior alterations for a future tenant. Signature Construction has been removed from this permit; letter attached. A new contractor has been assigned. 10/16/19 SR.
$350KAdd a double lobby door and connect the existing card reader on the fourth floor for Advantage Solutions as tenant. Framing.
$6.5K