1 Meadow St Ext
Norwalk, CT2024Mechanical
Installing a new HVAC system. Propane piping will be for temporary heating systems.
$6.4MLocal provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Installing a new HVAC system. Propane piping will be for temporary heating systems.
$6.4MNatural gas supply from the meter to the boilers and water heaters in the boiler room, and 3/4 gas supply to the kitchen.
$500Natural gas supply from the meter to the boilers and water heaters in the boiler room, and 3/4 gas supply to the kitchen.
$500Building package 22 plumbing for the construction of Jefferson Elementary.
$988KUnderground work only.
$190K