366 Sound Beach Ave
Greenwich, CT- 2021Plumbing
IPC. Install underground gas line from meter to pool heater. Amendment (5/18/21): Install gas line through basement from meter to pool heater.
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
IPC. Install underground gas line from meter to pool heater. Amendment (5/18/21): Install gas line through basement from meter to pool heater.
Cap off plumbing to Oyster Bar. IPC. Amendment (6/25/21): Cap off water lines and 2 drains to a bar sink and 2 floor drains.
Install gas line for pool heated underground.
Install 2 underground gas lines from the propane tank to the existing regulator and gas manifold for the outside grill, pizza oven, and firepit. Receipt 20-0973.
$3.5KMove the water service line (in the way of the pool); install a gas line for 2 pool heaters.
2 50 lb. Propane tanks for cooking.
Install 2" underground gas line from the meter to the pool heater. IPC.
Special event plumbing. Receipt 19-2637 for $100 paid. Gas from 2 100 lbs. Tanks to equipment; 12/35 lbs. Tanks to equipment.
15 - 301B tanks, propane for cooking; 2 - 1001B tanks, propane for cooking.
4 100 lb. Tanks for kitchen equipment, stove, oven, and fryers.
Install 2 waterlines: 1 to barn and 2 hose faucets.
Basement: 1 nw: laundry tub, clothes washer; First floor: replace 1: water closet, rub, basin, sink, dishwasher, 1 nw: basin; gas pipe for furnace, water htr., fireplace, stove grill; new on-demand water heater; repipe water.
Third floor: remove sink and dishwasher; cap off water lines and waste lines; remove kitchen facilities.
Basement: 1 new water closet, shower, and clothes washer; 2 new sinks. First floor: 1 new clothes washer. Install new laundry in the basement and first floor.
8 45 lb. Propane tanks. Receipt 19-0080 for $100 paid.
Gas line for 2 pool heaters; underground gas line for fire pit.
New generator, 7.5 kilowatts.
Relocate gas line for pool equipment; retest entire line.
Gas pipe to generator. Receipt 18-2122 for $40 paid.
First floor: 2 new water closets, basins, and floor drains; 1 new urinal and hose bib. Install rough-in waste and water piping for the Comfort Station. Hook up the waste line to the existing line. Tie in the water line to the existing line on the property, coming from the house at 140 Stanwich Rd.
First floor: replace water closet, basin, sink, clothes washer, and dishwasher. Second floor: move 1 water closet and tub; install 1 new water closet and shower. Run new gas line to the attic for the HVAC unit; hook up gas to the stove, hot water heater, and air handler.
Gas line to generator. Receipt for $40 paid.
Plumbing for spec. Event 18-0201 for $100 paid.
Special event. Receipt 17-1050 for $100 paid.
Plumbing work for spec. Event. Receipt 16-1116 for $100 paid.
Propane tanks for gas grills for cooking.
Install a gas line underground from the meter for 2 pool heaters.
First floor: Replace 1 water closet, basin, sink, and dishwasher.
Gas pipe to generator. Receipt 17-3342 for $40 paid.
Special-event plumbing for tents. Receipt 17-1728 for $100 paid. Gas line for propane heater.
First floor: replace 1 water closet and basin; install 1 new shower, sink, and dishwasher. Relocate gas for stove. Replace second-floor stack and move second-floor water lines.
First floor: 1 nw: sink, dishwasher; roughin relocated kitchen sink; gas line for stove and fireplace.
Second floor: 1 new water closet, tub, and basin.
First floor: 1 new water closet, basin, shower, sink, clothes washer, and dishwasher; 2 new hose bibs. Run new waterline from main house. Install new gas line from main house to pool house. Install all new fixtures. Run gas to all appliances. Hot-air furnace on-demand hot water. Pool heater.
Basement: 1 new water closet and tub on a sewage pump.
First floor: replace 1 sink; install 1 new dishwasher. New gas line from propane tank to new stove.
Gas pipe generator. Receipt for $40 paid. 17-0152.
Test gas line for pool heater. That was never inspected. Amendment (4/19/17): Replace gas line for pool heater, underground 2" plastic from meter in house to pool heater.
First floor: 1 nw: sink, dishwasher, replace 1: clothes washer; new gas line for stove and dryer.
Gas line to pool htr.
Gas line preexisting from the original pool and heater.
Retest/test gas line for pool.
Test propane gas line for pool heater.