The work performed in 2 bathrooms included updating the drainage and vent stack for lower-level shower pan, updating the location of valve connections to install the toilets and vanity by a licensed plumber. Bathroom #1 on upper level and Bathroom#2 on lower level. The AC is new as the house doesn't have central air, installed in attic. Electrical is updating electrical box and adding recess lights to living room.-Electric work also included a new circuit for bathroom outlets, new circuit for kitchen outlets, new lights in kitchen and new sub-panel in the first floor hallway.
Remodel the following rooms: 1. Convert the first-floor living room to a master bedroom, adding an egress window, and convert the current master bedroom to a living room to access the existing family room. 2. Relocate the first-floor kitchen and rearrange plumbing to the existing first-floor Mudd room.