2016Electrical
2003 UNIT #2 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.
$401K2016Electrical
2003 UNIT #13 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.
$401K2016Electrical
Building. #1 Unit 8. 5 -at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
Building. #2 - Unit 5. 2 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
, 2003, Unit #39, Building #3 at Wilbur Peck Ct., North Building. IBC complete renovation of bathrooms in 39 apartments in Building #3, as more specifically described on page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and in the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: On the first floor, replace 13 water closets, tubs, and sinks, and install 13 new floor drains. On the second floor, replace 13 water closets, tubs, and sinks, and install 13 new floor drains. On the third floor, replace 13 water closets, tubs, and sinks, and install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; and replace or re. Install piping and vents as necessary. Electrical: At Building #3 at Wilbur Peck Ct., North Building, remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.
$401K2016Electrical
Building. #2 - Unit 5. 3 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
2003 UNIT #21 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.
$401K2016Electrical
Building. #2 - Unit 6. 3 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
Building. #1 Unit 8. 7 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
2003, Unit #36, Building #3 at Wilbur Peck Ct.–North Building. Complete renovation of 39 bathrooms in Building #3, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Ct.–North Building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.
$401K2016Electrical
2003 UNIT #11 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.
$401K2016Electrical
2003 UNIT #14 – Building #3 at Wilbur Peck Ct., North Building. IBC: Complete renovation of the bathrooms in 39 apartments in Building #3, as more specifically described on page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and in the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: On the first floor, replace 13 water closets, tubs, and sinks; install 13 new floor drains. On the second floor, replace 13 water closets, tubs, and sinks; install 13 new floor drains. On the third floor, replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; and replace or re. Install piping and vents as necessary. Electrical: At Building #3, Wilbur Peck Ct., North Building, remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.
$401K2016Electrical
Building #1, Unit 8. 1, at Wilbur Peck Ct. (South building), 38 units [72-110]. Complete renovation of 39 bathrooms in Building #1, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lay faucet; install a new floor drain; replace stops and supplies for the lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (South building). Remove and replace lighting over the sink and GFI, and add a bathroom exhaust fan in each of 39 apartments.
$401K2016Electrical
Building. #1 Unit 1. 0. 9 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
, 2003 Unit #24, Building #3 at Wilbur Peck Ct., North Building. IBC: Complete renovation of bathrooms in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Ct., North Building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.
$401K2016Electrical
Building. #2 - Unit #40 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
2003, Unit #23, Building #3 at Wilbur Peck Ct., North building. Complete renovation of bathrooms in 39 apartments in Building #3, as more specifically described on page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and in the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: On the first floor, replace 13 water closets, tubs, and sinks and install 13 new floor drains. On the second floor, replace 13 water closets, tubs, and sinks and install 13 new floor drains. On the third floor, replace 13 water closets, tubs, and sinks and install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; and replace or re. Install piping and vents as necessary. Electrical: At Building #3 at Wilbur Peck Ct., North building, remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.
$401K2016Electrical
2003 Unit #8, Building #3 at Wilbur Peck Court, North Building. Complete renovation of bathrooms in 39 apartments in Building #3, as more specifically described on page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and in the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Court, North Building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.
$401K2016Electrical
2003 UNIT #22 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.
$401K2016Electrical
Building. #2 - Unit #41 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
2003, Unit #25 – Building #3 at Wilbur Peck Ct., north building. Complete renovation of the bathrooms in 39 units of Building #3, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Ct., north building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.
$401K2016Electrical
Building. #1 Unit 1. 0. 6 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
Building. #1 Unit 1. 0. 2 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
Building #1, Unit 7. 9, at Wilbur Peck Ct. (South building), 38 units [72–110]. Complete renovation of bathrooms in 39 bathrooms of Building #1, as more specifically described on (i) page CVR of the attached architect’s drawings, dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lay faucet; install a new floor drain; replace stops and supplies for the lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (South building). Remove and replace lighting over the sink and GFI, and add a bathroom exhaust fan in each of 39 apartments.
$401K2016Electrical
Building. #2 - Unit 4. 4 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
Building. #2 - Unit 6. 7 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
2003 UNIT #27 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.
$401K2016Electrical
Building. #2 - Unit 6. 5 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
Building. #1 Unit 9. 4 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
2003 UNIT #30 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.
$401K2016Electrical
Building. #1 Unit 9. 7 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
Building. #1 Unit 9. 1 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
Building. #2 - Unit 5. 8 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
Building. #2 - Unit 5. 6 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
Building. #2 - Unit 5. 5 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
Building. #2 - Unit 5. 4 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
, Building #1, Unit 8. 2, at Wilbur Peck Ct. (South building), 38 units [72–110], 2003 IBC. Complete renovation of bathroom in 39 bathrooms of Building #1, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lay faucet; install a new floor drain; replace stops and supplies for the lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (South building). Remove and replace lighting over the sink and GFI, and add a bathroom exhaust fan in each of 39 apartments.
$401K2016Renovation
Building. #2 - Unit 6. 6 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54.
$329K2016Electrical
Building. #2 - Unit 6. 8 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
Building. #2 - Unit 6. 4 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Renovation
2003 Building #3 at Wilbur Peck Ct., North Building. Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26.
$401K2016Electrical
2003 UNIT #16 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.
$401K2016Electrical
Building. #1 Unit 9. 3 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
Building. #1 Unit 8. 8 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
, 2003, Unit #3, Building #3 at Wilbur Peck Ct., North Building. IBC complete renovation of bathrooms in 39 bathrooms of Building #3, as more specifically described on page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; and replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Ct., North Building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.
$401K2016Electrical
Building. #2 - Unit #43 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
Building. #1 Unit 1. 0. 8 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
, Building #1, Unit 8. 4, at Wilbur Peck Ct. (South building), 38 units [72–110], 2003 IBC. Complete renovation of bathroom in 39 bathrooms of Building #1, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (South building). Remove and replace lighting over the sink and GFI, and add a bathroom exhaust fan in each of 39 apartments.
$401K2016Electrical
Building. #2 - Unit 6. 0 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
Building #1, Unit 1. 1. 0, at Wilbur Peck Ct. (South building), 38 units [72–110]. Complete renovation of bathrooms in 39 bathrooms of Building #1, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lay faucet; install a new floor drain; replace stops and supplies for the lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (South building). Remove and replace lighting over the sink and GFI, and add a bathroom exhaust fan in each of 39 apartments.
$401K2016Electrical
2003 UNIT #1 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.
$401K2016Electrical
Building #1, Unit 1. 0. 3, at Wilbur Peck Ct. (South building), 38 Units [72-110]. Complete renovation of bathroom in 39 bathrooms of Building #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lay faucet; install a new floor drain; replace stops and supplies for the lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (South building). Remove and replace lighting over the sink and GFI, and add a bathroom exhaust fan in each of 39 apartments.
$401K2016Electrical
2003 UNIT #28 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.
$401K2016Electrical
2003 UNIT #10 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.
$401K2016Renovation
Building. #2 @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54.
$329K2016Electrical
Building #1, Unit 7. 4, at Wilbur Peck Ct. (south building), 38 units [72–110]. Complete renovation of bathrooms in 39 bathrooms of Building #1, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lay faucet; install a new floor drain; replace stops and supplies for the lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (south building). Remove and replace lighting over the sink and GFI, and add a bathroom exhaust fan in each of 39 apartments.
$401K2016Electrical
Building. #1 Unit 8. 6 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
Building. #2 - Unit 7. 0 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
Building. #1 Unit 1. 0. 7 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
Building. #1 Unit 9. 9 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
Building #1, Unit 7. 2, HC Unit, at Wilbur Peck Ct. (South building), 38 Units [72-110]. Complete renovation of bathroom in 39 bathrooms of Building #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lay faucet; install a new floor drain; replace stops and supplies for lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (South building). Remove and replace lighting over sink, GFI, and add a bathroom exhaust fan in each of 39 apartments.
$401K2016Electrical
2003, Unit #5, Building #3 at Wilbur Peck Ct., North Building. Complete renovation of bathrooms in 39 apartments in Building #3, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Ct., North Building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.
$401K2016Electrical
2003 UNIT #17 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.
$401K2016Electrical
Building. #2 - Unit #42 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
Building. #1 Unit 9. 2 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
Building. #2 - Unit 4. 6 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
Building. #2 - Unit 6. 2 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
2003 UNIT #19 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.
$401K2016Renovation
Building. #1 at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26.
$401K2016Electrical
2003, Unit #33, Building #3 at Wilbur Peck Ct., North Building. Complete renovation of bathrooms in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Ct., North Building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.
$401K2016Electrical
Building. #1 Unit 8. 9 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
Building. #2 - Unit 5. 9 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
Building. #1 Unit 7. 2 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
Building. #2 - Unit 6. 1 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
Building. #1 Unit 1. 0. 5 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
Building. #2 - Unit 7. 1 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
2003 UNIT #38 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.
$401K2016Electrical
Building #1, Unit 1. 0. 0, at Wilbur Peck Ct. (South building), 38 units [72-110]. Complete renovation of bathroom in 39 bathrooms of building #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (South building). Remove and replace lighting over the sink and GFI, and add a bathroom exhaust fan in each of 39 apartments.
$401K2016Electrical
Building. #1- Unit 1. 0. 1 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
2003 Unit #15, Building #3 at Wilbur Peck Ct.–North Building. Complete renovation of bathrooms in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; and replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Ct.–North Building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.
$401K2016Electrical
Building. #2 - Unit 5. 7 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
Building. #1UNIT 80 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
, building #1, Unit 9. 5, at Wilbur Peck Ct. (South building), 38 units [72–110], 2003 IBC. Complete renovation of 39 bathrooms in building #1, as described on page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and in the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lay faucet; install a new floor drain; replace stops and supplies for the lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (South building). Remove and replace lighting over the sink and GFI, and add a bathroom exhaust fan in each of 39 apartments.
$401K2016Electrical
Building. #2 - Unit 4. 8 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
2003 Unit #31 – Building #3 at Wilbur Peck Ct., North Building. Complete renovation of bathrooms in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Ct., North Building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.
$401K2016Electrical
Building. #2 - Unit 5. 0 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
2003 UNIT #12 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.
$401K2016Electrical
Building. #1- Unit 7. 5 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
2003 UNIT #32 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.
$401K2016Electrical
Building. #1UNIT 83 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
Building. #1 Unit 7. 7 - HC Unit - -at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
Building. #2 - Unit 4. 7 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
Building. #1 Unit 1. 0. 4 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
Building. #2 - Unit 5. 1 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
2003 UNIT #26 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.
$401K2016Electrical
Building. #2 - Unit 6. 9 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.
$329K2016Electrical
2003 Unit #20, Building #3 at Wilbur Peck Ct., North Building. Complete renovation of bathrooms in 39 apartments in Building #3, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Ct., North Building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.
$401K2016Electrical
Building. #1 - Unit 7. 3 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K2016Electrical
Building. #1 Unit 9. 6 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.
$401K