Skip to content

Local provider profile

Redstone Company

Documented work across Connecticut based on attributed municipal records.

Jobs on record114Recorded in our system
Reported work volume$43MDocumented jobs
Average project$377KWhere values are reported
First observed2016Available dataset
Categories2Observed work types
Used for work inGreenwich114 jobs

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Aerial image of 27 Havemeyer Pl, Greenwich, CT

27 Havemeyer Pl

Greenwich, CT
2017Renovation

Sample kitchen renovation and restoration to Unit B-3 at Town Hall Annex Apartments, including but not necessarily limited to removing and replacing the existing cabinets, countertops, sink, and faucet, and installing a new ventless hood/microwave, together with related plumbing and electrical work. State education fee paid: $3.90.

$15.3K
Aerial image of 20 Wilbur Peck Ct, Greenwich, CT

20 Wilbur Peck Ct

Greenwich, CT99 jobs on record
2016Electrical

2003 UNIT #2 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.

$401K
View all 99 jobs
  • 2016Electrical

    2003 UNIT #2 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.

    $401K
  • 2016Electrical

    2003 UNIT #13 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.

    $401K
  • 2016Electrical

    Building. #1 Unit 8. 5 -at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    Building. #2 - Unit 5. 2 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    , 2003, Unit #39, Building #3 at Wilbur Peck Ct., North Building. IBC complete renovation of bathrooms in 39 apartments in Building #3, as more specifically described on page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and in the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: On the first floor, replace 13 water closets, tubs, and sinks, and install 13 new floor drains. On the second floor, replace 13 water closets, tubs, and sinks, and install 13 new floor drains. On the third floor, replace 13 water closets, tubs, and sinks, and install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; and replace or re. Install piping and vents as necessary. Electrical: At Building #3 at Wilbur Peck Ct., North Building, remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.

    $401K
  • 2016Electrical

    Building. #2 - Unit 5. 3 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    2003 UNIT #21 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.

    $401K
  • 2016Electrical

    Building. #2 - Unit 6. 3 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    Building. #1 Unit 8. 7 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    2003, Unit #36, Building #3 at Wilbur Peck Ct.–North Building. Complete renovation of 39 bathrooms in Building #3, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Ct.–North Building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.

    $401K
  • 2016Electrical

    2003 UNIT #11 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.

    $401K
  • 2016Electrical

    2003 UNIT #14 – Building #3 at Wilbur Peck Ct., North Building. IBC: Complete renovation of the bathrooms in 39 apartments in Building #3, as more specifically described on page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and in the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: On the first floor, replace 13 water closets, tubs, and sinks; install 13 new floor drains. On the second floor, replace 13 water closets, tubs, and sinks; install 13 new floor drains. On the third floor, replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; and replace or re. Install piping and vents as necessary. Electrical: At Building #3, Wilbur Peck Ct., North Building, remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.

    $401K
  • 2016Electrical

    Building #1, Unit 8. 1, at Wilbur Peck Ct. (South building), 38 units [72-110]. Complete renovation of 39 bathrooms in Building #1, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lay faucet; install a new floor drain; replace stops and supplies for the lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (South building). Remove and replace lighting over the sink and GFI, and add a bathroom exhaust fan in each of 39 apartments.

    $401K
  • 2016Electrical

    Building. #1 Unit 1. 0. 9 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    , 2003 Unit #24, Building #3 at Wilbur Peck Ct., North Building. IBC: Complete renovation of bathrooms in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Ct., North Building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.

    $401K
  • 2016Electrical

    Building. #2 - Unit #40 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    2003, Unit #23, Building #3 at Wilbur Peck Ct., North building. Complete renovation of bathrooms in 39 apartments in Building #3, as more specifically described on page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and in the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: On the first floor, replace 13 water closets, tubs, and sinks and install 13 new floor drains. On the second floor, replace 13 water closets, tubs, and sinks and install 13 new floor drains. On the third floor, replace 13 water closets, tubs, and sinks and install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; and replace or re. Install piping and vents as necessary. Electrical: At Building #3 at Wilbur Peck Ct., North building, remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.

    $401K
  • 2016Electrical

    2003 Unit #8, Building #3 at Wilbur Peck Court, North Building. Complete renovation of bathrooms in 39 apartments in Building #3, as more specifically described on page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and in the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Court, North Building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.

    $401K
  • 2016Electrical

    2003 UNIT #22 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.

    $401K
  • 2016Electrical

    Building. #2 - Unit #41 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    2003, Unit #25 – Building #3 at Wilbur Peck Ct., north building. Complete renovation of the bathrooms in 39 units of Building #3, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Ct., north building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.

    $401K
  • 2016Electrical

    Building. #1 Unit 1. 0. 6 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    Building. #1 Unit 1. 0. 2 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    Building #1, Unit 7. 9, at Wilbur Peck Ct. (South building), 38 units [72–110]. Complete renovation of bathrooms in 39 bathrooms of Building #1, as more specifically described on (i) page CVR of the attached architect’s drawings, dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lay faucet; install a new floor drain; replace stops and supplies for the lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (South building). Remove and replace lighting over the sink and GFI, and add a bathroom exhaust fan in each of 39 apartments.

    $401K
  • 2016Electrical

    Building. #2 - Unit 4. 4 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    Building. #2 - Unit 6. 7 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    2003 UNIT #27 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.

    $401K
  • 2016Electrical

    Building. #2 - Unit 6. 5 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    Building. #1 Unit 9. 4 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    2003 UNIT #30 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.

    $401K
  • 2016Electrical

    Building. #1 Unit 9. 7 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    Building. #1 Unit 9. 1 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    Building. #2 - Unit 5. 8 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    Building. #2 - Unit 5. 6 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    Building. #2 - Unit 5. 5 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    Building. #2 - Unit 5. 4 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    , Building #1, Unit 8. 2, at Wilbur Peck Ct. (South building), 38 units [72–110], 2003 IBC. Complete renovation of bathroom in 39 bathrooms of Building #1, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lay faucet; install a new floor drain; replace stops and supplies for the lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (South building). Remove and replace lighting over the sink and GFI, and add a bathroom exhaust fan in each of 39 apartments.

    $401K
  • 2016Renovation

    Building. #2 - Unit 6. 6 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54.

    $329K
  • 2016Electrical

    Building. #2 - Unit 6. 8 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    Building. #2 - Unit 6. 4 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Renovation

    2003 Building #3 at Wilbur Peck Ct., North Building. Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26.

    $401K
  • 2016Electrical

    2003 UNIT #16 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.

    $401K
  • 2016Electrical

    Building. #1 Unit 9. 3 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    Building. #1 Unit 8. 8 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    , 2003, Unit #3, Building #3 at Wilbur Peck Ct., North Building. IBC complete renovation of bathrooms in 39 bathrooms of Building #3, as more specifically described on page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; and replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Ct., North Building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.

    $401K
  • 2016Electrical

    Building. #2 - Unit #43 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    Building. #1 Unit 1. 0. 8 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    , Building #1, Unit 8. 4, at Wilbur Peck Ct. (South building), 38 units [72–110], 2003 IBC. Complete renovation of bathroom in 39 bathrooms of Building #1, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (South building). Remove and replace lighting over the sink and GFI, and add a bathroom exhaust fan in each of 39 apartments.

    $401K
  • 2016Electrical

    Building. #2 - Unit 6. 0 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    Building #1, Unit 1. 1. 0, at Wilbur Peck Ct. (South building), 38 units [72–110]. Complete renovation of bathrooms in 39 bathrooms of Building #1, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lay faucet; install a new floor drain; replace stops and supplies for the lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (South building). Remove and replace lighting over the sink and GFI, and add a bathroom exhaust fan in each of 39 apartments.

    $401K
  • 2016Electrical

    2003 UNIT #1 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.

    $401K
  • 2016Electrical

    Building #1, Unit 1. 0. 3, at Wilbur Peck Ct. (South building), 38 Units [72-110]. Complete renovation of bathroom in 39 bathrooms of Building #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lay faucet; install a new floor drain; replace stops and supplies for the lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (South building). Remove and replace lighting over the sink and GFI, and add a bathroom exhaust fan in each of 39 apartments.

    $401K
  • 2016Electrical

    2003 UNIT #28 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.

    $401K
  • 2016Electrical

    2003 UNIT #10 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.

    $401K
  • 2016Renovation

    Building. #2 @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54.

    $329K
  • 2016Electrical

    Building #1, Unit 7. 4, at Wilbur Peck Ct. (south building), 38 units [72–110]. Complete renovation of bathrooms in 39 bathrooms of Building #1, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lay faucet; install a new floor drain; replace stops and supplies for the lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (south building). Remove and replace lighting over the sink and GFI, and add a bathroom exhaust fan in each of 39 apartments.

    $401K
  • 2016Electrical

    Building. #1 Unit 8. 6 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    Building. #2 - Unit 7. 0 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    Building. #1 Unit 1. 0. 7 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    Building. #1 Unit 9. 9 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    Building #1, Unit 7. 2, HC Unit, at Wilbur Peck Ct. (South building), 38 Units [72-110]. Complete renovation of bathroom in 39 bathrooms of Building #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lay faucet; install a new floor drain; replace stops and supplies for lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (South building). Remove and replace lighting over sink, GFI, and add a bathroom exhaust fan in each of 39 apartments.

    $401K
  • 2016Electrical

    2003, Unit #5, Building #3 at Wilbur Peck Ct., North Building. Complete renovation of bathrooms in 39 apartments in Building #3, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Ct., North Building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.

    $401K
  • 2016Electrical

    2003 UNIT #17 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.

    $401K
  • 2016Electrical

    Building. #2 - Unit #42 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    Building. #1 Unit 9. 2 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    Building. #2 - Unit 4. 6 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    Building. #2 - Unit 6. 2 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    2003 UNIT #19 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.

    $401K
  • 2016Renovation

    Building. #1 at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26.

    $401K
  • 2016Electrical

    2003, Unit #33, Building #3 at Wilbur Peck Ct., North Building. Complete renovation of bathrooms in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Ct., North Building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.

    $401K
  • 2016Electrical

    Building. #1 Unit 8. 9 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    Building. #2 - Unit 5. 9 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    Building. #1 Unit 7. 2 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    Building. #2 - Unit 6. 1 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    Building. #1 Unit 1. 0. 5 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    Building. #2 - Unit 7. 1 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    2003 UNIT #38 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.

    $401K
  • 2016Electrical

    Building #1, Unit 1. 0. 0, at Wilbur Peck Ct. (South building), 38 units [72-110]. Complete renovation of bathroom in 39 bathrooms of building #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (South building). Remove and replace lighting over the sink and GFI, and add a bathroom exhaust fan in each of 39 apartments.

    $401K
  • 2016Electrical

    Building. #1- Unit 1. 0. 1 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    2003 Unit #15, Building #3 at Wilbur Peck Ct.–North Building. Complete renovation of bathrooms in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; and replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Ct.–North Building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.

    $401K
  • 2016Electrical

    Building. #2 - Unit 5. 7 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    Building. #1UNIT 80 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    , building #1, Unit 9. 5, at Wilbur Peck Ct. (South building), 38 units [72–110], 2003 IBC. Complete renovation of 39 bathrooms in building #1, as described on page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and in the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste overflow, and lay faucet; install a new floor drain; replace stops and supplies for the lavatory sink and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #1 at Wilbur Peck Ct. (South building). Remove and replace lighting over the sink and GFI, and add a bathroom exhaust fan in each of 39 apartments.

    $401K
  • 2016Electrical

    Building. #2 - Unit 4. 8 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    2003 Unit #31 – Building #3 at Wilbur Peck Ct., North Building. Complete renovation of bathrooms in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Ct., North Building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.

    $401K
  • 2016Electrical

    Building. #2 - Unit 5. 0 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    2003 UNIT #12 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.

    $401K
  • 2016Electrical

    Building. #1- Unit 7. 5 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    2003 UNIT #32 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.

    $401K
  • 2016Electrical

    Building. #1UNIT 83 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    Building. #1 Unit 7. 7 - HC Unit - -at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    Building. #2 - Unit 4. 7 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    Building. #1 Unit 1. 0. 4 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    Building. #2 - Unit 5. 1 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    2003 UNIT #26 - building #3 at Wilbur Peck Ct.-North building. IBC Complete renovation of bathroom in 39 bathrooms of Building #3, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work(2pgs). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.,; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; in bathroom. Of each of 39 apartments remove and replace sink, toilet, bathtub, tub/shower valve and trim, waste and overflow and lavatory faucet; install new floor-drn; replace stops and supplies for lavatory, sink and toilet; replace or re. Install piping and vents as nec. Electrical: building #3 at Wilbur Peck Ct.-North building. - remove/ replace light over sink and GFI; add bathroom exhaust. Fan in each of 39 units.

    $401K
  • 2016Electrical

    Building. #2 - Unit 6. 9 - @ Wilbur Peck Ct. (Middle building) Complete renovation of bathroom in 32 bathrooms of building. #2, as more specifically described on 1 page CVR of the attached Architect's drawings dated 7/22/15 and revised 6/24/16 (6pgs) and (ii) the attached Scope of Work (2pgs). State Ed. Fee paid.: $85.54 electrical: remove/replace light over sink and GFI; add bathroom exhaust. Fan in ea. Of 32 units (building. 2) PLUMB: first floor: replace 10: water closets, tubs, sinks, 10 nw: floor-drns.; Second floor: replace 11: water closets, tubs, sinks, 11 nw: floor-drns.,; Third floor: replace 11: water closets, tulbs, sinks, 11 nw: floor-drns.replace sotps and supplies for lavatory sink and toilet; replace or re. Install piping and vents as nec.

    $329K
  • 2016Electrical

    2003 Unit #20, Building #3 at Wilbur Peck Ct., North Building. Complete renovation of bathrooms in 39 apartments in Building #3, as more specifically described on (i) page CVR of the attached architect’s drawings dated 7/22/15 and revised 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State education fee paid: $104.26. Plumbing: First floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Second floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. Third floor: replace 13 water closets, tubs, and sinks; install 13 new floor drains. In the bathroom of each of 39 apartments, remove and replace the sink, toilet, bathtub, tub/shower valve and trim, waste and overflow, and lavatory faucet; install a new floor drain; replace stops and supplies for the lavatory, sink, and toilet; replace or re. Install piping and vents as necessary. Electrical: Building #3 at Wilbur Peck Ct., North Building. Remove and replace the light over the sink and GFI; add a bathroom exhaust fan in each of 39 units.

    $401K
  • 2016Electrical

    Building. #1 - Unit 7. 3 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K
  • 2016Electrical

    Building. #1 Unit 9. 6 - at Wilbur Peck Ct. (South building) - 38 Units [72-110] - 2003 IBC - Complete renovation of bathroom in, 39 bathrooms of building. #1, as more specifically described on (i) page CVR of the attached Architect's drawings dated: 7/22/15 and revised: 6/24/16 (7 pages), and (ii) the attached Scope of Work (2 pages). State Ed. Fee paid.: $104.26 PLUMB: first floor: replace 13: water closet/s, tubs, sinks, 13 nw: floor. Drns.; Second floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drns.; Third floor: replace 13: water closets, tubs, sinks, 13 nw: floor-drs. In each of 39 apartments remove/replace sink, toilet, bathtub, tub/shower valve and trim, waste overflow and lay faucet; install new floor-drain; replace stops and supplies for lavatory sink and toilet; repalce or re. Install piping and vents as nec. Electrical: building. #1 at Wilbur Peck Ct. (South building). Remove/replace lightig over sink, GFI and add bathroom. Exhaust. Fan in each of 39 apts.

    $401K