Skip to content

Local provider profile

Redwood Construction & Consulting LLC

Documented work across Connecticut based on attributed municipal records.

Reported work volume$6.4MDocumented jobs
Average project$920KWhere values are reported
First observed2021Available dataset
Categories7Observed work types
Used for work inGreenwich12 jobsStamford2 jobsDarien1 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

Phone
(203)470-2375source record

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 40 Orchard St, Greenwich, CTSatellite view
2025

40 Orchard St

Greenwich, CT
  • 2025Electrical

    Electrical Work

  • 2025Electrical

    Electrical Work

  • 2025Plumbing

    Plumbing Work

  • 2024Plumbing

    Plumbing Work

  • 2024New Construction

    Foundation / Earthwork

  • 2024New Construction

    Building Permit

    $1.4M
Satellite view of 92 Dolphin Cove Quay, Stamford, CTSatellite view
2024

92 Dolphin Cove Quay

Stamford, CT
  • 2024Demolition

    Roof replacement and reframing - with 2 x 10 Interior demo due to water damage. Move the kitchen to the rear of the house and includes moving the powder room to the front of the house.

    $670K
Satellite view of 128 Fairview Ave, Stamford, CTSatellite view
2021

128 Fairview Ave

Stamford, CT
  • 2021Roofing

    The interior was gutted due to fire. Existing joists remain. Interior trim-out includes millwork and hardwood floors; tile flooring remains. Replace the roof, and replace some joists. The attic floor is to be replaced. First floor: 1936 SF; garage: 576 SF; Second floor: 1373 SF; Third floor: 143 SF. (MS) Plans were revised as of June 24,2021. The footprint has not changed. Roof plans have some adjustments. Interior walls on the first and second floors have some changes. Add two dormers totaling 200 SF. The roof pitch has changed. The first-floor full bath will now be a powder room.

    $1M