111 Bedford Rd
Greenwich, CT- 2022Electrical
Generator
$8.5K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Generator
$8.5KElectrical Work
ELE
Electrical Work
Rewire 2 new condenser/furnaces in the basement and attic on existing feeders from the main rec.; 2 air conditioning motors.
$1.5KRelocate overhead 200-amp service to a 200-amp meter main underground, with new grounding electrode and rods. Receipt 20-1046.
$3.8KElectrical: install wiring for generator and transfer switch.
$14K400-amp service. Remove old equipment; main switch, 5-meter main. New 400 3 om 120/208 main switch; 5-gang meters, 1150-amp 3 om, and 1 100-amp 3 om. Amendment (6/25/20): 400-amp existing service; 1 150-amp panel only on the second floor, 150 main; 2 100-amp panels only for 2 apartments on the third floor, with 60-amp main.
Electrical — overhead service change.
$2.4K1: Range, clothes dryer, air conditioning motor, and dishwasher; 20-amp for washer; 20-amp, 240 volts for air conditioning system; 15 recessed lights, bathroom fan, new outlets, switches, and 3 GFI as needed; new 100-amp, 12 circuit.
Demolish 1 wall; remove old recessed lights, outlets, with dryer; secured wiring as needed; relocate electrical. Panel to be determined.
10 devices installed; relocate 4 lights ovm reception; install 3 20-amp circuits from panel; relocate wiring as needed for new partition.
8 devices installed; remove 4 double-duplex devices from the existing walk to prepare for a new 2-hour walk; re. Install 4 boxes and an outlet, 1 exit light, and 2 emergency lights.
20 kW generator. HVAC: Gas line to generator. Receipt for $48 paid.
$9.8K1 existing GFI, 1 exhaust fan, 1 new paddle fan, 3 existing switches, 4 recessed exiting, relocation.
2 devices installed; 2 gas brnr. Motors 200-amp service Existing one meter (200-amp), to be 200-amp 2-meter, main. And wire 2 gas furnaces. Amendment (9/6/17): 35 devices installed; (200-amp); 2 12 recessed lights per kitchen; 2 kitchen, 5 20-amp circuits per kit. 1 20-amp bathroom.
Wiring to an outdoor front lawn sign from existing feeders from a time clock in the basement.