Robert D Billings

Documented work across Connecticut based on attributed municipal records.

Reported work volume$441KDocumented jobs
Average project$55.1KWhere values are reported
First observed2021Available dataset
Categories2Observed work types
Used for work inNorwalk7 jobsGreenwich3 jobsWeston1 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

Phone
(203)616-4211source record
Email
[email protected]source record

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 10 Hillandale Mnr, Norwalk, CTSatellite view
2023

10 Hillandale Mnr

Norwalk, CT
  • 2023Electrical

    Installation of 6 Tesla Powerwall battery storage units; 6 total installed, grid-tie and backup.

    $65.9K
Satellite view of 1 Bartlett Mnr, Norwalk, CTSatellite view
2023

1 Bartlett Mnr

Norwalk, CT
  • 2023Electrical

    Roof-mounted solar PV installation: 30 Hanwha Q-Peak Blk MU-610a-1 Tesla 3.8+400 modules, 1 Tesla 3.8 kW inverter, and 1 Tesla 7.6 kW inverter.

    $35K
Satellite view of 1 Orchard Hill Ct, Norwalk, CTSatellite view
2022

1 Orchard Hill Ct

Norwalk, CT
  • 2022Electrical

    Install 53 roof-mounted solar panels with a 125 amp load-side connection.

    $90K
  • 2022Solar

    Install 53 roof top mounted solar panels with 2 battery storage units – No structural upgrade.

    $95.8K
Satellite view of 18 Range Rd, Norwalk, CTSatellite view
2022

18 Range Rd

Norwalk, CT
  • 2022Electrical

    Install 56 roof top mounted solar panels - line side 8- amp with 50-amp battery.

    $30K
  • 2022Solar

    Install 56 rooftop-mounted solar panels with battery storage. No structural upgrade.

    $35.7K
Satellite view of 25 Covlee Dr, Norwalk, CTSatellite view
2022

25 Covlee Dr

Norwalk, CT
  • 2022Electrical

    Install 43 roof-mounted solar panels, 1 Generac inverter, and 12 battery storage units. No structural upgrades.

    $60K