47 Gilbert St
Ridgefield, CT- 2026Plumbing
New 1st foor bathroom and laundry (new rough plumbing and second floor bathroom (new rough plumbing).
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
New 1st foor bathroom and laundry (new rough plumbing and second floor bathroom (new rough plumbing).
Kitchen Renovation- No new rough just fixture relpacementsinstall 1 new kicthen sink, connect ice maker and dishwasher and install water line and drain for 1 ice machine.
Relocate 5 feet of existing baseboard heat from the entry to the hallway wall. Relocate 7 feet of existing baseboard heat from the front entry to the stairway wall.
Kitchen and (1) bathroom renovation (no new rough-ins or locations).
New rough-in for 2.5 bathrooms, kitchen, and laundry.
Kitchen plumbing renovation; install 2 new replacement kick space heaters.
Rough-in for 2 full baths and 1 half bath, with fixture installations.
Kitchen renovation: new sink, dishwasher, and ice maker piping installation.
Gas piping for 1 stove and 1 fireplace.
New powder room rough-in and kitchen renovation. Install a dishwasher and ice maker line.
Basement rough plumbing for a kitchenette and bathroom, including a sewage ejector pump.