9 2 2026 Ct
Trumbull, CT- 2026Electrical
200amp service upgrade.
$3.8K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
200amp service upgrade.
$3.8KEL2
$16KExhaust fan renovation.new partition walls.new with sensor and vented in master bathroom.
$1.2KFan and receptacles.
$1.6KElectrical Work
$3.5KEV charger.
$2.5KWire above REPLACEMENT ground pool OF 1 4 LITE BOW UNIT, 2 PICTURE WINDOWS, 1 GLIDING.
$2KWire above REPLACEMENT ground pool OF 1 DOUBLE-HUNG PICTURE-DOUBLE-HUNG UNIT, 2 SINGLE.
$2.1KElectrical Work
$1KElectrical Permit and Voice/Data
$1KEv charger.
$800Relocate 2 Reroofing roofing. 2. recommendations and the American of following edge material. 4. the bottom architectural-style accordance receptacles, install dual breaker, replace 9 receptacles all in basement Job Description: Asphalt Shingles Roof1. Removal of all existing shingles Install plywood. Plywood will be installed in whole sheets only following by both the National Roofing Contractors Association (NRCA) Plywood Association (APA). Where it be needed. 3. Replacement flashing materials: step flashings, collars, pipe jacks, perimeter drip Ice and water protection membrane shall be installed two rolls in of the roof. 5. Installation of new shingles lifetime warranty, laminated, algae-resistant shingles. Shingles will be installed in strict with the manufacturer's specifications and shall be fastened using six.
$500200amp service upgrade.
$3KReplace the 200-amp panel with a new panel and new breakers, and update grounding.
$1.8KWire above TEAR OFF 15 SQUARES ground pool EXISTING ASPHALT SHINGLES INSPECT DECKING AND INSTALL OF NEW ASPHALT SHINGLES UP TO CODE WITH 4 INCH SEAM TAPE.
$2KRB-26-37update bathroom to codevanity lightsrecess shower light.
$2.5KKitchen renovation, Swap Out subpanel Lights for LED and Wire Exam Rooms in Healthcare. Re work existing to.
$6KEV charger.
$1KElectrical Work
Electrical Work
Wire AC Remove existing asphalt architectural shingles and install a new Owens Corning roofing system with shingles. Ice and Water Barrier and Seam Tape to code. 28.
$500Wire ductless first floor shower to shower replacement with the same footprint and no structural.
$800Wire washer Existing cedar and dryer siding is being entirely replaced with James Hardie composite board.
$800200amp service upgrade.
$3KWire kitchen.
$6.5KWire ductless.
$1.5KWire central AC, 3 ton.
$1KWiring bedroom addition.
$6K200-amp OH service upgrade.
$4.2KBasement remodel; Strip and remove will not be performing; If there is Existing decking: drip edge will Barrier on six prone to leaking. Underlayment lifetime Architectural Shingles in never leak vent Type: N/A Number: counter flashing. Existing shingles on home and detached garage down to decking any work to low pitch slope over back sunroom: layers: 1 sq: 22 existing plywood decking, seams will be taped with 4 inch joint tape. Tongue and Groove(home) plywood(garage).; Extra wide F-8 aluminum be installed on eaves and rakes. Color: white; Install Ice and Water feet on first course, on intersecting roof sections, in valleys and all areas; Install Starter Strip on eaves and rakes.; Install Synthetic 42" wide synthetic underlayment with reinforced fiberglass.; Install Shingles. Duration Color: ONYX BLACK; Install Ridge Cap all ridges and hips same color as shingle choice.; Install new seamless boots around vent pipe. Number: 1; Additional vents will be replaced: 0; Properly step flash around chimney and install new lead Number of Chimneys: 1; Current Ventilation on the house : GABLE’S.
$3KWire septic pump.
$500200amp service Changes per Relocate 2 door locks Install new relocate 2 ED-1.1C dated Added labor/material wire light per Install power upgrade revised print dated 11/12/24; ED-1.1A Demo 11 fixtures ED-2.1A smokes ED-2.1A Demo power walls ED-2.1A Demo/ install power for E-1.1A Install lighting and wire per revised print (dated 11/12/24) E-2.1A wiring per revised print (dated 11/12/24) Fixtures included NOTE: Added smokes and power only for door per print dated 11/12/24 Demo per print 11/12/24 Install lighting and wiring per print E-1.1C dated 11/12/24 4L-11 Demo per print ED-1.3C dated 11/12/24 Relocate and print E-1.3C dated 11/12/24 Demo per print ED-2.1C dated 6/20/24 and outlets ETC print E-2.1C dated 11/12/24 Print ED-2.3C dated.
$2.9KEv charger Run gas line filler station run water lines for: 1 water bottle for dryer, remodel 2 bathrooms, 1 steam fireplace.
$1.5KElectrical Work
$1KLighting upgrade and receptacles for retail space.
$20KMaster bedroom Existing Food Court Space for new Take Out suite renovation.
$7KElectrical Work
The meter was taken down by a tree. Replace the meter pack and service mast.
$1.2KWire ductless.
$500200amp service upgrade.
$3KReplace main breaker.
$4K200amp service upgrade.
$2.5KWire first floor space, no work except adding a sink in one of the AC.
$900EV charger.
$700Pool bonding, wire inground pool.
$5K2 Bathrooms: adding recess lightings, fan and switches.
$1.5K24 kW generator. Source of fuel: 3 LP 120 tanks.
$13.5KElectrical Work
$1K200AMP OH service installation of warm air heating and cooling systems. The heating and cooling loads are.
$2.5K200amp service first floor tub to upgrade shower conversion with the same footprint and no structural work. Install.
$2.5K4000 wire Full between Kitchen sub-panel insulationNew sinkRelocate bathroom locationComplete fixtures. Install code. Install add showerRelocate toilet inground swimming pool Kitchen remodel-Refer to attached drawingsRemove load bearing wall kitchen and living room-Refer to attached engineer specsUpdate electrical to meet current NEC electrical code. Add 100amp. electrical in unfinished section of basement area. New R-15 fiberglass wall R-30 fiberglass ceiling insulationreplace window over kitchen kitchen appliances within new kitchen design. 1st. floor primary-Refer to attached drawingAll fixtures are to remain in original Demolition of bathroom walls-floor-ceiling and new electrical wiring-fixtures-outlets to meet NEC electrical new bathroom exhaust fan-vent to exteriorRemove radiatior and new toe kick heaterRemove bathtub and build new 60-by-30-foot" tub drain to new shower drain locationReplace shower valves-vanityReplace shutoff valves on toilet and sink water lines. Install R-15.
$6.6K600 wire Remove replace single ductless 5 double hung single pane windows from the 3 bedrooms and them with 5 double hung double pane windows. Remove 2 double hung pane windows from the 2 bathrooms and replace them with 2 double.
$6.6K4500 underground service.
$6.6KWire central air conditioning.
$1.2KElectrical Alteration
$800Electrical Work
$1K200-amp OH service upgrade.
$2KElectrical Work
$500Wire (1) air handler and (1) condenser.
$1KWire a 22 kW Generac generator. Rob Piro. Fuel source will be natural gas.
$10KWire gas furnace and central air system.
$1KWire Central AC.
$1K2 furnaces and 2 condensers.
$2KWire 1 condenser and 1 air handler.
$800Install a 16 kW Generac generator powered by natural gas.
$10KCentral air conditioning.
$900Increase to 200-amp.
$2.3KWire central air conditioning.
$1KElectrical work for upstairs bathroom renovations, first-floor powder room, and kitchen. Work done by others; will update to 2019 codes.
$1.5KElectrical work to bring the finished basement up to code.
$1KElectrical - 1 sty. Rear addition - bath, closet and living room.
$1KElectrical service upgrade.
$1.4K