Special event. Receipt for $100 paid. Players Group. Inspection 2/27/20 at 10 AM.
2019Electrical
Special event electrical. Receipt 19-0306 for $100 paid. Inspection Wednesday, 2/27 at 10:00 AM.
2019Electrical
Special event electrical. Receipt 19-1767 for $100 paid.
2018Electrical
Temp. Electric for Special Event lighting. Inspection March 1st, 2 PM. Performance Dates: 3/2, 3/3, 3/4/3/9, 3/10, 3/11. receipt 18-0285 for $100 paid.
2018Electrical
Special Event lighting/tent: receipt 18-1904 for $100 paid.
2017Electrical
Special event lighting. Receipt 17-0243 for $100 paid. Inspection 2/27 at 1 PM.
2017Electrical
Temp. power for Spec. Event : 7/11/ - 7/15/17. Inspection 7/10/17 at noon or 1 PM. Receipt 17-2117 for $100 paid. State Inspection Tues. July 11, 2017 at 10 AM. Receipt for $100 paid.
2016Electrical
Temporary power for special event: 7/12–7/16/16. Inspection 7/11 at 12 noon or 1 PM. Receipt 16-2202 for $100 paid.
2016Electrical
Temp. stage lighting for spec. Event. March 4, 5, 6 and March 11, 12, 13; inspection March 4th at 9AM. receipt 16-0504 for $100 paid.
2016Electrical
Disconnect and reconnect appliances for kitchen alteration.
7 kW generac generator electrical: install of new generator for sump pumps, hall and interior lights on owner's gas meter. Receipt for $40 paid. Receipt 21-2975.
44 devices installed; 200-amp service. Permanent remote electric service for path lighting and future athletic field equipment; 16 LED tunnel lights; 28 LED bollards for path lighting.
$30K
2019Electrical
Install temporary service for construction (100-amp service.
Disconnect and reconnect existing as needed; relocate meter and panel; install outlets and lighting for new area. 200-amp service; 6 switches, 10 outlets, and 15 light fixtures. Amendment (5/20/21): alarm and security system.
2016Electrical
Change to underground service, 200 amps.
2016Electrical
Disconnect and reconnect roof, air conditioning and refrigerant units, and exhaust fan.
22 kW generator. Plumbing: Build new conference room; relocate 2 diffusers; install 1 new diffuser and return in reception air. No equipment outside; no major duct replaced; all interior work.
400-amp service: change from o.h. to underground service. Amendment (1/3/17): 135 devices installed; 3 air conditioning motors, 3 gas brnr. Motors(Amend to include wiring of 3 apartments being renovated). Amendment (4/4/17): 2 air conditioning motors, gas brnr. Motors; permit amended to include Apts. 2 and 3. Amendment (11/8/17): 50 devices installed; wire Lower Level (retail space).
16 kilowatt generator. 2009 IRC HVAC: Gas line to generator. Receipt 16-0391 for $40 paid. Plumbing: Install gas piping from tank to generator. Receipt 16-0532 for $40 paid.