New Canaan, CT- 2026Renovation
Demolish the primary bathroom. Move the wall between the bathroom and closet to enlarge the primary bathroom and reduce the closet. Keep all plumbing fixtures in the same locations and enlarge the shower. Miscellaneous framing, electrical, and plumbing; new insulation on exterior walls; new drywall; new tile on the main floor and in the shower; a new vanity and plumbing fixtures; new trim; and paint. Half bathroom: demolish the half bathroom. Plumbing fixtures to remain in the same locations. Install new insulation in the exterior wall. Miscellaneous plumbing and electrical; new drywall; new tile on the main floor and in the tub area; a new vanity and plumbing fixtures; new trim; and paint.
$80K