Skip to content

Local provider profile

Sally Wiese-Kropp

Documented work across Connecticut based on attributed municipal records.

Reported work volume$6.2KDocumented jobs
Average project$6.2KWhere values are reported
First observed2025Available dataset
Categories1Observed work types
Used for work inNorwalk1 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

No contact information was found in the available records.

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 28 County St, Norwalk, CTSatellite view
2025

28 County St

Norwalk, CT
  • 2025Mechanical

    Removal of one (1) 550-gallon #2 underground storage tank. Remove overburden above the tank, vacuum remaining product and sludge from the tank, and load the tank for transportation. Field-screen soil samples from the tank grave and submit them for laboratory analysis. Backfill the tank grave to grade with clean overburden and process fill. Submit a report documenting tank closure and laboratory analytical results.

    $6.2K