35 Ridgeview Ave
Greenwich, CT2 jobs on recordHVAC Work
View all 2 jobs
- 2026Mechanical
HVAC Work
- 2024Mechanical
HVAC Work
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
HVAC Work
HVAC Work
HVAC Work
Install a new heat-pump system.
HVAC Work
HVAC Work Plumbing
HVAC Work
HVAC Work
HVAC Work
HVAC Work
Install one Mitsubishi Hyper Heat Pump system (air handler and condenser), 2-ton system.
$12.8KInstall 2 new heat pumps HVAC systems.
$55KHVAC
Install a 24,000 BTU heat pump system.
$4.5KHVAC
HVAC Work
HVAC Work
HVAC Work
HVAC Work
HVAC Work
HVAC Work
HVAC Work
HVAC Work
HVAC Work
HVAC Work
HVAC Work
HVAC Work
HVAC Work
HVAC Work
HVAC Work
HVAC Work
HVAC
HVAC
HVAC
$7.8KHVAC
HVAC
HVAC
6 heat pump systems, air-to-air, with air handlers and condensers.
2 high eff. Gas furnaces with air conditioning units ACCA Manual J.
2 direct-vent, 2-stage gas furnaces with air conditioning coils and condensers. ACCA Manual J.
2 hydro air units with air conditioning system.
Install 2 heat pump units.
$15KMechanical work: move the air handler, install new ductwork in the great room, and add an extra zone.
$6K2 hydro-air systems with 2 condensers; 1 gas boiler, direct vent; 1 80-gallon hot water tank. ACCA Manual J.
Install a separate zone for the basement area from the existing unit, with ductwork installation. ACCA Manual J.
Install a separate zone for the basement area from the existing unit, with ductwork installation. ACCA Manual J.
2 80,000 BTU high-efficiency gas furnaces with 2 air conditioning systems.
3 direct vent propane furnaces with 3 air conditioning system.
2 hydro air units; 150 direct-vent gas boiler; indirect hot water tank; 4-zone Mitsubishi ductless.
2 high-efficiency furnaces with air conditioning coils and condensers. ACCA Manual J.
IMC. Relocate a couple of vents and install radiant heat for the kitchen area. ACCA Manual J.
2 high-eff. Gas furnaces with air conditioning units installed.
Install 2 60,000 Btu gas-fired high-efficiency furnaces with coil and ductwork. Install 2 condensing units.
Install condensers, ductwork, refieration line, oil boiler, and indirect water heater.
Extend existing ductwork; supply and return.
One new hydro-air system with ductwork and 2 condensing unit.
Install 2 air conditioning systems with hot water coil.
Install 1 heat pump unit.
Relocate furnace and reconnect ductwork.
2 high-efficiency gas furnaces with air conditioning system.
2 hydro air systems, 1 gas boiler, 1 indirect hot water tank.
Install kitchen exhaust for gas stove.
2 high-eff. Gas furnaces with air conditioning system.
Install PEX hydro-air handler and new ductwork for a new zone (no condenser work).
High-efficiency gas boiler with 80-gallon indirect hot water tank; 2 hydro-air systems with condensing unit.
2 hydro air units and kitchen air-conditioning condensers; 1 gas boiler, 150000 Btu; 1 60-gallon indirect hot water tank.
Disconnect the existing gas boiler; install a new high-efficiency gas boiler and indirect water tank.
$7KInstall 2 high-efficiency gas furnaces with coil and air conditioning condenser.
Replace existing condensing unit and air handlers.
2 gas furnaces with air conditioning units.
2 high-efficiency gas furnaces with air conditioning condensers.
Install new ductwork for the basement area.
Install a new 2.5-ton hydro-air heating and air conditioning system.
Update pool heater.
150000 bas-fired direct-vent boiler; 80-gallon indirect hot water tank; 2 hydro-air units with air conditioning.
High-efficiency gas boiler and 80-gallon indirect hot water tank; 2 hydro-air systems with condensing unit.
High-efficiency gas boiler; indirect hot water tank; 2 hydro-air systems (heat and air conditioning).
2 2-ton hydro air systems; 1 gas combi boiler (heat and hot water).
2 hydro-air heating and air conditioning system; gas-fired direct-vented boiler; 80-gallon Superstore hot water tank.
Install 2 hydro-air heating and air conditioning units, 1 direct-vent gas boiler, and an 80-gallon hot water heater.
2 gas furnaces with 2 air conditioning systems.
2 90+% gas furnaces with air-conditioning systems.
2 60,000 BTU furnaces with 2.5-ton air conditioning.
Relocate supply and return ductwork; replace existing condensing unit.
Install 4 hydro units with air conditioning condensers.
New hvac for 1624 SF. Home, hydro-air.
2 hydro-air system: heating and air conditioning, 1 high-efficiency gas boiler, and 1 80-gallon indirect hot water tank.
3 hydro air system, 200000 BTU boiler, 80-gallon indirect hot water tank.
Filling for the existing pool heater to be able to sign off.
New gas line; boiler replacement, and 60 gallon. Hot water heater.
$2KInstall 5 hydro-air systems (heating and air conditioning) with ductwork.
200000 BTU propane boiler with 80-gallon hot water tank; 3 hydro-air (heating and air conditioning) systems.
$800K2 hydro-air systems (heating and cooling); 1 200000 BTU propane boiler; 80-gallon hot water tank.
Install 2 air handlers with ductwork (condensing by others).
3 hydro air system heat and air conditioning.
Install kitchen exhaust vent.
Permit for existing pool heater, to be able to sign off.
2 hydro-air heating and air-conditioning systems; 1 direct-vent gas boiler (150000 BTU); 1 indirect hot-water tank.
2 60,000 Btu gas furnaces, direct vent; 2 2-ton air conditioning systems.
Install 6 supply vents from existing ductwork.
Install 3 gas furnaces with an air conditioning system.
2 new direct-vent gas furnaces, 70,000 BTU each; 2 new air conditioning systems; 1 tankless hot water tank.
3 hydro-air systems, 200000 btu's, gas boiler 80 gallon. Indirect h/w htr.
2 hydro-air systems with air conditioning; 160 btu boiler; 80-gallon indirect hot water tank.