Commercial alteration: legalization of a new restaurant in an existing location; replacement of kitchen equipment; new individual grease collection at sinks; updates to egress and life-safety systems; and addition of new Type 1 kitchen exhaust to the existing exhaust hood. Install a 2-hour fire-rated separation above the hood in the kitchen at the second-floor mechanical room. B-25-927.
RemodelingWork description updated to provide the following details: Exterior siding and interior plaster demolition, new windows, new kitchen and bathrooms (first floor second floor and attic), new heat and AC for entire house new electrical service and wiring for entire house, new plumbing-gas new lines water supply for entire house, drywall, hardwood floors paint framing attic and relocating first floor half bathroom from existing to dining room area". (Noted 2/14/22 MK).