148 E Ave
Norwalk, CT- 2025Electrical
Imaging center renovation - new lighting and control system - new branch circuits, wiring devices, low voltage pathways, relocating panels, and HVAC power feeds - alteration of existing fire alarm system.
$296K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Imaging center renovation - new lighting and control system - new branch circuits, wiring devices, low voltage pathways, relocating panels, and HVAC power feeds - alteration of existing fire alarm system.
$296KFire alarm system extended, 25,970 sf tenant fit out -adding new lighting, wiring devices, low voltage, pathways for all as well- adding new panels and relocating 2 other panels too.
$410KElectrical work for medical offices, including power, lighting, fire alarm, raceways for tele/data and security, distribution from the existing service, and raceways and power for medical equipment.
$589KElectrical-x ray room.
$28KElectrical work associated with replacement of MRI equipment.
$49.8KElectrical to “Ct Diagnostic Procedure” — third floor.
$110KRenovation of two rooms for new Siemens equipment, including power, lighting, and low-voltage cabling.
$58.9KRenovation and 100A overhead alteration of an existing Endoscopy Room. Relocate the service meter from the right side of the house to the front of the home (right).
$739K41508 new Build equipment being installed in both rooms. A 3,424 SF home with a 3 car garage, 4 bedrooms, 3 full and 1 half baths.
23944 dirctly outside the space.
New data drops, lighting repairs, and new plugs as required.
$24.2KDemolition and fit-out of urgent care power, lighting, fire alarm, and raceways for tele/data; rework of existing distribution for a new main panel; raceways and power for GE x-ray equipment.
$97.8K