Underground plumbing - 2 water closets, 2 urinals, 2 lavatory and 1 slop sink, move underground from floor area to wall on left side of garage, complete rough when floor is patched.
$3.5K
2023Mechanical
Gas pipe, 1 boiler tankless and 1 hot water tankless.
Air test on existing gas line for HVAC furnace before installing gas meter - gas meters are located at front left of building - Unit 2 - located at right side - 1st garage door to left_.