Install gas piping from meter to all units. Install 3 dayton ng tube heaters, 3 modine ng unit heaters, 1 rinnai ng water heater, install american standard condenser and first company air handler, 1 bath fan and piping for clothes dryer.
Run NG line to new heating units - install 4 Modine heaters, 3 Dayton radiant tube heaters, 1 Rinnat gas water heater, bath fan and dryer venting - all heaters include venting - electrical provided by Russell Speeders.
Convert the wood fireplace to propane. Install a white Mountain VFSE-24: slope glaze propane gas log set into the existing chimney on the exterior wall of the home. Run a new LP line from the existing LP tank to the log set.
$3.5K
2025Mechanical
Install an LP gas line for the BBQ. Trench 5' and install 5' of PE UG LP line from the tanks to the house. Run a gas line through the basement to the other side of the home to connect to the BBQ. Install a grill hose with a shutoff at the grill.
$2.5K
2024Mechanical
Install (2) 120 LP tanks and run underground LP line from the tanks to the generator.
Tank on left Rehab grade side of house next to chimney. Pour outdoor Roth concrete pad level bathroom, move toilet and sink, new shower enclosure, tile,.
13995 air conditioning. Basic Install exterior condenser to left side of home. Kitchen Remodel: no structural changes; replacing cabinets like for like;
Install 24 kW generator on the left side of the home. Updated to reflect Generac # G007042-2, powered by LPG (not provided by the contractor). Noted 10/4/22: MK.