8 31 2026
Trumbull, CT- 2026Building Permit
Eaves and valleys, Replace 4-ton and tape on all plywood seams. Hydro air handler and 4-ton condenser. Add 1 zone and relocate the.
$9K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Eaves and valleys, Replace 4-ton and tape on all plywood seams. Hydro air handler and 4-ton condenser. Add 1 zone and relocate the.
$9KAnd AMST36BU13 air handler and controls.
$17KAnd AMST36CU13 Primary Bathroom wiring, lights 30 and exterior area of existing air handler and controls. Remodel-Entire bathroom demolition- Update Electrical and switches-Remove existing sauna tub- update ceiling insulation R- wall insulation R-15-relocate sink location/convert to double sink in sauna-shower remains in same location-Toilet remains in same.
$13KNew electrical Remove all damaged decking. Over all joints from panel to condenser and install outdoor outlet. Existing roofing materials down to decking. Inspect and replace any Install full GAF roofing system per code, including seam tape in decking, underlayment, drip edge, ventilation, and ridge cap.
$2K