Skip to content

Local provider profile

Stanley J McKenney Jr

Documented work across Connecticut based on attributed municipal records.

Jobs on record12Recorded in our system
Reported work volume$2.6MDocumented jobs
Average project$217KWhere values are reported
First observed2019Available dataset
Categories4Observed work types
Used for work inNorwalk11 jobsStamford1 jobs

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Aerial image of 31 Winfield St, Norwalk, CT

31 Winfield St

Norwalk, CT
2022Mech Alt Comm

Installation of (2) new 60 HO low-pressure steam heating boilers and an associated feed water tank.

$287K
Aerial image of 383 Main Ave, Norwalk, CT

383 Main Ave

Norwalk, CT
2022Mech Alt Comm

Provide temporary piping, cooling tower, heat exchanger and pump for connection to existing condenser water loop serving heat pumps located within Merrittview building, modify existing condenser water piping and connect heat exchanger via use of temporary flex hose; install and secure all temporary piping for connection to temporary pump and cooling tower, run temp makeup water line to temporary tower and install overflow and drain and pipe to ground.

$85K
Aerial image of 34 Maple St, Norwalk, CT

34 Maple St

Norwalk, CT6 jobs on record
2021Mechanical

Installation of new plate and free heat exchangee, piping, pump, valves and controls for implementation of 400-ton free cooling system; installation of new 500 HP steam boiler with new piping and mechanical venting.

$766K
View all 6 jobs
  • 2021Mechanical

    Installation of new plate and free heat exchangee, piping, pump, valves and controls for implementation of 400-ton free cooling system; installation of new 500 HP steam boiler with new piping and mechanical venting.

    $766K
  • 2020Demolition

    Demolish and remove existing chilled-water piping, steam piping, and ductwork. Modify ductwork to allow operation of the serving space. Furnish and install a new AHU in the renovated pharmacy area. Furnish and install a new return fan, ductwork, and chilled-water and steam piping, and connect them to the new AHU. Demolish and remove the existing AHU and associated ductwork. Install new ductwork and connect it to the existing fan coil unit.

    $398K
  • 2019Plumbing

    Plumbing renovations for a pharmacy, per plans.

    $20.5K
  • 2019Mechanical

    Mechanical renovations at the pharmacy, per plans.

    $57.3K
  • 2019Mechanical

    Mechanical: Booster pump installation, including piping, wiring, insulation, and controls, per plans and specifications.

    $175K
  • 2019Mechanical

    Mechanical: Install new AHU with required wiring, piping, and ductwork per plans and specifications.

    $178K
Aerial image of 429 Washington Blvd, Stamford, CT
2020Mechanical

Cooling tower replacement. Total cost of the project was included in mechanical permit TM-20-120.

$470K
Aerial image of 1 Jennings Pl, Norwalk, CT

1 Jennings Pl

Norwalk, CT2 jobs on record
2019Plumbing

Plumbing: domestic and sanitary piping for locker rooms.

$74.2K
View all 2 jobs
  • 2019Plumbing

    Plumbing: domestic and sanitary piping for locker rooms.

    $74.2K
  • 2019Mechanical

    Mechanical: Install ductless VRF system and locker room exhaust.

    $70K
Aerial image of 731 W Ave, Norwalk, CT

731 W Ave

Norwalk, CT
2019Mechanical

Mechanical: dryer duct work.

$18K