31 Winfield St
Norwalk, CTInstallation of (2) new 60 HO low-pressure steam heating boilers and an associated feed water tank.
$287KLocal provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Installation of (2) new 60 HO low-pressure steam heating boilers and an associated feed water tank.
$287KProvide temporary piping, cooling tower, heat exchanger and pump for connection to existing condenser water loop serving heat pumps located within Merrittview building, modify existing condenser water piping and connect heat exchanger via use of temporary flex hose; install and secure all temporary piping for connection to temporary pump and cooling tower, run temp makeup water line to temporary tower and install overflow and drain and pipe to ground.
$85KInstallation of new plate and free heat exchangee, piping, pump, valves and controls for implementation of 400-ton free cooling system; installation of new 500 HP steam boiler with new piping and mechanical venting.
$766KInstallation of new plate and free heat exchangee, piping, pump, valves and controls for implementation of 400-ton free cooling system; installation of new 500 HP steam boiler with new piping and mechanical venting.
$766KDemolish and remove existing chilled-water piping, steam piping, and ductwork. Modify ductwork to allow operation of the serving space. Furnish and install a new AHU in the renovated pharmacy area. Furnish and install a new return fan, ductwork, and chilled-water and steam piping, and connect them to the new AHU. Demolish and remove the existing AHU and associated ductwork. Install new ductwork and connect it to the existing fan coil unit.
$398KPlumbing renovations for a pharmacy, per plans.
$20.5KMechanical renovations at the pharmacy, per plans.
$57.3KMechanical: Booster pump installation, including piping, wiring, insulation, and controls, per plans and specifications.
$175KMechanical: Install new AHU with required wiring, piping, and ductwork per plans and specifications.
$178KCooling tower replacement. Total cost of the project was included in mechanical permit TM-20-120.
$470KPlumbing: domestic and sanitary piping for locker rooms.
$74.2KPlumbing: domestic and sanitary piping for locker rooms.
$74.2KMechanical: Install ductless VRF system and locker room exhaust.
$70KMechanical: dryer duct work.
$18K