2 Sayles St
Greenwich, CT- 2026Mechanical
HVAC Work
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
HVAC Work
HVAC Work
Relocate the air system return in the family room into a cabinet, and relocate the high-wall supply duct in the kitchen wall being removed.
$3.8KFurnish and install 2 hydro air systems with 2 condensers outside. All ductwork, refrigerant and condensate piping, and duct venting for exhaust fans.
$49.9KHVAC Work
Relocating an oil-fired boiler smoke pipe; venting 4 bathroom exhaust fans, 1 clothes dryer, and 1 kitchen exhaust hood fan with a makeup air system if needed.
$12KHVAC
Furnish and install (2) 1 1/2 ton AC-only systems with ductwork.
$30KHVAC Work
Furnish all duct venting for new and existing clothes dryers, 1 bathroom exhaust, kitchen exhaust, relocate return duct in basement for steel beam install.
$2KFurnish and install 3 straight AC split systems with all necessary ductwork, installation, and condensate piping.
$35KHVAC Work
HVAC Work
HVAC Work
Furnish and install 1 2-ton air handler and condenser outside with all necessary ductwork, refrigeration and condensate piping, 1 mitsubishi 1-ton air handler and condenser outside with all necessary refrigerant condensate piping.
$12.8KFurnish and install 2 gas furnace/AC split systems with necessary ductwork and piping.
$28KMechanical: Furnish and install a heat pump/air conditioning split system with all necessary ductwork, piping, and refrigerant.
$18KFurnish and install 2 Trane 2 1/2-ton hydro/air conditioning split units with all necessary ductwork, refrigerant piping, and condensate piping.
$20KReplace the existing gas-fired 80% furnace with a new 96% gas furnace, leaving the existing evaporator coil above the furnace and the existing air conditioning condenser outside. Install new ductwork with 3 zones, 1 for each floor. ACCA Manual J.
Mechanical: Install a gas furnace, AC coil, and condenser with all necessary ductwork, refrigeration, and vent piping.
$15KMechanical: Install a gas furnace, AC coil and condenser with all necessary ductwork, refrigerant, piping, and exhaust fan venting.
$15.8KMechanical - install gas furnace in attic with condenser and coil, all required duct work for second floor, refrigerant and condensate piping.
$11KHVAC
Second floor: 1 95% gas furnace with air conditioning condenser; all ductwork, refrigerant, and condensate piping.
Furnish and install all necessary ductwork off the existing 5-ton system on the roof.
Kitchen exhaust duct and makeup air system.
2 95% gas furnaces with air conditioning for each condo; all nec. Ductwork, refrigerant and condensate piping; all venting.
Furnish 1 kitchen exhaust, venting, and makeup air system.
Mechanical: Install 3-ton AC split system and vent kitchen exhaust.
$17.5KMechanical: Install 2 gas furnaces with air conditioning, all ductwork, condenser and refrigerant piping, and all necessary venting ductwork for exhaust fans.
$22.9KRemove and replace all heating and air conditioning ductwork on the third floor, feeding second- and third-floor spaces; vent out bath fans and clothes dryer.
Furnish and install up to 7 Trane hydro-air split systems with all necessary ductwork, refrigerant and condensate piping, and all exhaust fan venting.
Furnish and install 2 Trane hydro-air split systems with ductwork, refrigerant and condensate piping. All exhaust fan venting.
Furnish and install 2 tons of ductwork that was damaged; furnish ductwork for 1 bath and 1 kitchen exhaust.
Furnish 1 gas (propane) furnace with all necessary ductwork in the attic for the yoga (hot) room only.
$7.2KFurnish and install all necessary ductwork, a fresh air exchanger, and an exhaust fan in the cigar room.
1 Trane gas furnace with air conditioning, ductwork, refrigerant and condensate piping, and exhaust for venting. All work to comply with applicable requirements.
6-7 Trane hydro-air split units with all necessary ductwork, refrigerant and condensate piping; 3 HRVs, 3 humidifiers, all exhaust fan venting, and 1 wine cellar split system.
Furnish and install 2 split hydro-air systems with ductwork, all condensate and refrigerant piping, and all ductwork for systems and exhaust ductwork.
Furnish and install 1 hydro/air conditioning 2-ton split system with ductwork and condensate lines.
Install 2 hydro-air split systems with all ductwork, piping, and ventilation.
Mechanical - Finish and install duct and run outs for addn.
$5KMechanical: Install split system.
$7.9KFurnish and install a 2.5-ton split system (hydro) with all accessory ductwork, refrigerant, and condensate piping; furnish all necessary kitchen exhaust venting.
Furnish and install 1 3-ton split system with all necessary ductwork, refrigerant piping, and condensate piping.
$8.9KRelocate 1 existing runout text ended 1 existing supply air run ouit to feed mudroom and bathroom.
Relocate 2 existing supply vents, 2 in the kitchen area; reconnect existing kitchen exhaust to the new kitchen hood.
Venting for kitchen exhaust; relocate supply duct into new kitchen cabinet toe-kick; relocate return in living room.
Relocate second-floor trunk duct; vent kitchen exhaust.
Gas furnace with air conditioning, including all necessary ductwork, condensate, venting, and refrigerant piping.
Install 1 15-by-20-foot hot water coil in existing 2-ton air handler; install ductwork for master suite and existing second-floor bedrooms; install 1 2-zone damper system; install venting for 1 bath fan.
Furnish and install ductwork to relocate an existing duct in the basement, add ductwork to the mudroom off existing, and add ductwork to the finished basement; vent duct for clothes dryer and bath fan.
2 new gas/air conditioning split systems for the new addition, with all necessary ductwork, refrigerant and condensate piping, and vent piping; remove and replace 3 existing split systems for the existing house.
Furnish venting only for the bath exhaust fan. Furnish 1 Field Controls fan-in-can for the boiler/boiler room. Amendment (2/22/17): Reroute existing basement supply ducts and add a return duct.
Install 3 gas/air conditioning split systems for 3 apartments and 1 ductless heat pump system for office admin. Parapet. Amendment (7/18/17): 2 95% gas furnaces with air conditioning (1 1/2-ton) condensers for each apartment. Amendment (11/9/17): Furnish/install 1 1/2-ton split air conditioning/gas heat system with all necessary ductwork and refrigerant and condensate piping (indoor).
80% gas furnace with air conditioning; all ductwork and venting.
Furnish and install 2 hydro/air systems with all ductwork, and exhaust fan venting consisting only of ductwork.
Furnish and install a gas furnace with air conditioning and ductwork, furnace flue venting, and refrigeration and condenser piping.
2 gas furnaces with air conditioning and all ductwork; all refrigerant and condensate piping; all exhaust for venting.