Skip to content

Local provider profile

Stewart Amusement Co

Documented work across Connecticut based on attributed municipal records.

Reported work volume$21KDocumented jobs
Average project$3KWhere values are reported
First observed2019Available dataset
Categories2Observed work types
Used for work inNorwalk7 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

No contact information was found in the available records.

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 10 Seaview Ave, Norwalk, CTSatellite view
2025

10 Seaview Ave

Norwalk, CT
  • 2025Ele Alt Comm

    Wire rides + concessions to generator for oyster fest to be held (9/5/25-9/7/25) inspection 9/5 10 a.m.

    $1K
  • 2025Tent

    Install rides at Norwalk Oyster Fest (9/5/25–9/7/25).

    $1K
  • 2022Ele Alt Comm

    Wire rides and concessions to a generator for Oyster Fest 2022, 9/9–9/11.

    $1K
  • 2022Tent

    Install rides for 2022 Norwalk Oyster Fest, 9/9–9/11.

    $1K
  • 2021Electrical

    Wire rides and concessions to a generator for Oyster Fest to be held Sept 10–12.

    $1K
  • 2021Tent

    Install carnival rides for Oyster Fest 2021. E21-0924-Ele No Fee: Wire rides and concessions to a generator for Oyster Fest to be held Sept. 10–12.

    $15K
  • 2019Electrical

    Electrical work: wire rides and concessions to the generator for the Norwalk Oyster Festival.

    $1K