Skip to content

Local provider profile

Susan K Walsh

Documented work across Connecticut based on attributed municipal records.

Reported work volume$916KDocumented jobs
Average project$131KWhere values are reported
First observed2015Available dataset
Categories2Observed work types
Used for work inGreenwich18 jobsNorwalk3 jobsTrumbull2 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

Phone
(203)294-4655source record

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 11 4 2025 Unit, Trumbull, CTSatellite view
2025

11 4 2025 Unit

Trumbull, CT
  • 2025Electrical

    250 and 280 (Yale New Haven Hospital NEMG) alongside permit CB-25-79.

    $11K
Satellite view of 801 Main Ave, Norwalk, CTSatellite view
2025

801 Main Ave

Norwalk, CT
  • 2025Electrical

    NIS is installing LV CAT6 plenum cable for phones and computers. NIS is working as a subcontractor to Signature Construction, building permit #B25-0224.

    $87K
Satellite view of 5 Perryridge Rd, Greenwich, CTSatellite view
2022

5 Perryridge Rd

Greenwich, CT
  • 2022Electrical

    Electrical Work

  • 2022Electrical

    Electrical Work

  • 2020Electrical

    NIS Inc. Will be installing Cat 6 plenum cable for 3 network locations in Room 2-157. NIS is working as a subcontractor to DeLuca Construction.

  • 2020Electrical

    NIS Inc. Will install CAT6 plenum cable for video cameras and speaker phones for a video monitoring project at the Helmsley building, Second floor: 11 ICU rooms and 18 telemetry rooms. Receipt 20-1651.

    $30K
  • 2019Electrical

    Network Installation Services will be installing low-voltage plenum cable for phones and computers on the third floor of Watson Pavillion. We are working as a subcontractor to Turner Construction for “New Administration Suite.”.

  • 2019Electrical

    56 voice/data locations; low-voltage plenum cable for phones and computers on the 1st and 3rd floors. For “inpatient bed renovations”; working as a subcontractor to DeLuca Construction.

  • 2019Electrical

    Network Installation Services will be installing plenum, low-voltage cabling for phones and computers on the second floor of Watson Pavillion, new medical office suite. NIS is working as a subcontractor for Deluca Construction.

  • 2019Electrical

    Cafeteria, main campus, ground floor: Network installation services will add 18 cables for phones and computers; install Cat6 plenum code.

  • 2018Electrical

    Watson Building, third floor, Infusion Room: Install CAT6 plenum cable for phones and computers (8 cables total); remove 8 cables.

  • 2017Electrical

    Tele/data cabling: 45 tele/data locations. Network Installaiton Services will install low-voltage plenum CAT6 cable for phones and computers.

  • 2015Electrical

    Cabling for voice and data at 3 locations using plenum cable; cabling for 1 camera/data using plenum cable.

Satellite view of 40 Richards Ave, Norwalk, CTSatellite view
2019

40 Richards Ave

Norwalk, CT
  • 2019Electrical

    Electrical: Install cabling for phones and computers (15 locations).

    $10K
Satellite view of 500 W Putnam Ave, Greenwich, CTSatellite view
2019

500 W Putnam Ave

Greenwich, CT
  • 2019Electrical

    Low-voltage CAT6 plenum cable for phones and computers as part of a larger building project with Wescorp Bldrs. IBC – Lessee: first- and second-floor renovations.

  • 2019Electrical

    Install low-voltage plenum Cat6 cable for phones and computers as part of a larger project with Wescorp Bldrs. On the third floor. IBC revisions.

  • 2016Electrical

    319 devices installed on the 2nd and 3rd floors. Network Installation Services will be installing low-voltage plenum cable for phones and computers.

  • 2016Electrical

    Exterior façade renovations. State education fee paid: $169.00. Amendment #1, dated 6.14.17: value $180,000; fee $2,786.80; elevator addition, approximately 600 SF. Amendment #2, dated 11.8.17: value $2,000,000; fee $30,589; interior tenant fit-out and related work for Greenwich Hospital tenant. Plumbing: On the second floor, 7 new water closets, basins, 24 new sinks, and 1 new floor drain. On the third floor, 13 new water closets, basins, 47 new sinks, and 2 new showers. Install gas piping from meter to boilers; install new water, waste, and vent piping to serve the new fixture layout; water heaters and plumbing fixtures; install medical gas piping and outlets. Electrical: Lessee: Greenwich Hospital Assn.; electrical wiring for equipment, lighting, and power accommodating the tenant’s needs, as per plans and specifications submitted and on file.

    $650K
Satellite view of 5 Greenwich Office Pk, Greenwich, CTSatellite view
2019

5 Greenwich Office Pk

Greenwich, CT
  • 2019Electrical

    In network installation services is installing plenum cable for phones and communications and computers; are making on the second floor. As part of larger renovation project.

Satellite view of 75 Holly Hill Ln, Greenwich, CTSatellite view
2019

75 Holly Hill Ln

Greenwich, CT
  • 2019Electrical

    First-floor network installation services to install Cat6 plenum cable for phones and computers as part of a larger construction project with Petra Construction. Permit 19-2594.

  • 2017Electrical

    60 telephone/data locations; Network Installation Svcs. To be installing low-voltage plenum CAT6 for phones and computers.