2024
6 6 2024 Trumbull
Trumbull, CT- 2024Mechanical
24,000 BTU head.
$8.5K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
24,000 BTU head.
$8.5KReplace the existing oil-fired hot-water boiler with a cast-iron boiler with a domestic coil and install a combustion-air intake kit.
$10K