Skip to content

Local provider profile

Tavolacci Joseph

Documented work across Connecticut based on attributed municipal records.

Reported work volume$1.1MDocumented jobs
Average project$164KWhere values are reported
First observed2017Available dataset
Categories4Observed work types
Used for work inGreenwich8 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

No contact information was found in the available records.

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 70 Bruce Park Ave, Greenwich, CTSatellite view
2019

70 Bruce Park Ave

Greenwich, CT
  • 2019Demolition

    Converting first floor to two apts. Zone 1 -! st Floor Apt #1 Basement apt completely demo and moved to first floor. Second floor 2 apts existing kitchens and bathroom. State educ fee paid $2.08 PLUMB: basement: replace 1: water closet, shower, sink; First floor: 2 nw: water closets, tubs, clthswhsrs., dshwshrs., floor-drns., 4 sinks; Second floor: replace 2: sinks, 2 nw: clthswshrs., dshwshrs., floor-drns.; cut and cap 2 gaslines on first floor. Electrical: 400-amp service; 58 devices installed; 5 meters and 2 panels to a new 5 gang meter bank 400-amp each meter to have a 100-amp disconnect at each meter panels to go in basement on one common wall; all new grounding bonding; in each unit will be installing 10 recessed, 8 surface lights, 14 outlets, 12 switches.

    $8K
  • 2019Demolition

    Converting first floor to two apts. Zone 4 - second floor - Apt #4 Basement apt completely demo and moved to first floor. Second floor 2 apts existing kitchens and bathroom. State educ fee paid $2.08 PLUMB: basement: replace 1: water closet, shower, sink; First floor: 2 nw: water closets, tubs, clthswhsrs., dshwshrs., floor-drns., 4 sinks; Second floor: replace 2: sinks, 2 nw: clthswshrs., dshwshrs., floor-drns.; cut and cap 2 gaslines on first floor. Electrical: 400-amp service; 58 devices installed; 5 meters and 2 panels to a new 5 gang meter bank 400-amp each meter to have a 100-amp disconnect at each meter panels to go in basement on one common wall; all new grounding bonding; in each unit will be installing 10 recessed, 8 surface lights, 14 outlets, 12 switches.

    $8K
  • 2019Demolition

    Converting first floor to two apts. Zone 5 - Stairs and Basement - Common Areas Basement apt completely demo and moved to first floor. Second floor 2 apts existing kitchens and bathroom. State educ fee paid $2.08 PLUMB: basement: replace 1: water closet, shower, sink; First floor: 2 nw: water closets, tubs, clthswhsrs., dshwshrs., floor-drns., 4 sinks; Second floor: replace 2: sinks, 2 nw: clthswshrs., dshwshrs., floor-drns.; cut and cap 2 gaslines on first floor. Electrical: 400-amp service; 58 devices installed; 5 meters and 2 panels to a new 5 gang meter bank 400-amp each meter to have a 100-amp disconnect at each meter panels to go in basement on one common wall; all new grounding bonding; in each unit will be installing 10 recessed, 8 surface lights, 14 outlets, 12 switches.

    $8K
  • 2019Renovation

    Converting first floor to two apts. Basement apt completely demo and moved to first floor. Second floor 2 apts existing kitchens and bathroom. State educ fee paid $2.08 Amend #1: 6.17.19 val $12,000 fee $223.12 exterior work windows replacement and paint exterior 8.9.19 Final Value val $62,500 fee $835.38.

    $8K
  • 2019Demolition

    Converting first floor to two apts. Zone 2 -! st Floor and Bsmt - Apt #2 Basement apt completely demo and moved to first floor. Second floor 2 apts existing kitchens and bathroom. State educ fee paid $2.08 PLUMB: basement: replace 1: water closet, shower, sink; First floor: 2 nw: water closets, tubs, clthswhsrs., dshwshrs., floor-drns., 4 sinks; Second floor: replace 2: sinks, 2 nw: clthswshrs., dshwshrs., floor-drns.; cut and cap 2 gaslines on first floor. Electrical: 400-amp service; 58 devices installed; 5 meters and 2 panels to a new 5 gang meter bank 400-amp each meter to have a 100-amp disconnect at each meter panels to go in basement on one common wall; all new grounding bonding; in each unit will be installing 10 recessed, 8 surface lights, 14 outlets, 12 switches.

    $8K
  • 2019Demolition

    Converting first floor to two apts. Zone 3 - second floor - Apt #3 Basement apt completely demo and moved to first floor. Second floor 2 apts existing kitchens and bathroom. State educ fee paid $2.08 PLUMB: basement: replace 1: water closet, shower, sink; First floor: 2 nw: water closets, tubs, clthswhsrs., dshwshrs., floor-drns., 4 sinks; Second floor: replace 2: sinks, 2 nw: clthswshrs., dshwshrs., floor-drns.; cut and cap 2 gaslines on first floor. Electrical: 400-amp service; 58 devices installed; 5 meters and 2 panels to a new 5 gang meter bank 400-amp each meter to have a 100-amp disconnect at each meter panels to go in basement on one common wall; all new grounding bonding; in each unit will be installing 10 recessed, 8 surface lights, 14 outlets, 12 switches.

    $8K
Satellite view of 100 Lewis St, Greenwich, CTSatellite view
2017

100 Lewis St

Greenwich, CT
  • 2017Foundation / Earthwork

    New construction of a two-family residence with finished basements, attached 2-car garages, and rear patios. State education fee paid: $286.00.

  • 2017New Construction

    New construction of a two-family residence with finished basements, attached 2-car garages, rear patios, and elevators. State education fee paid: $286.00. Amendment #1 dated 10.24.17: value $40,000; fee $570.40; installation of 2 residential elevators. Final value dated 6.21.18: $400,000; fee $5,304.

    $1.1M